BIM-based design method for prefabricated pipeline components
HU Zhenzhong1, CHEN Xiangxiang1, WANG Liang2, HE Tianfeng1
1. Department of Civil Engineering, Tsinghua University, Beijing 100084, China;
2. The First Construction Engineering Limited Company of China Construction Third Engineering Bureau, Wuhan 430040, China
Abstract:The industrialization of China is creating prefabricated pipelines instead of pipeline made on site. However, prefabricated pipeline design methods are not entirely suitable for manufacturing in the factory and assembling on site. A building information model (BIM) is introduced here for designing prefabricated pipelines. An automatic prefabricated pipeline design method was developed for dividing the pipelines with a semi-automatic design method for pipeline supports and an intelligent assembling method for pipeline groups. A general purpose prefabricated pipeline design system was then developed. The method addresses three core issues for model visualization, progressive parametric modeling and information sharing.The model is applied to two real-world projects to show the enhanced design efficiency and reduced material waste.
[1] Lu N, Liska R W. Designers and general contractors perceptions of offsite construction techniques in the United State construction industry [J]. International Journal of Construction Education and Research, 2008, 4(3): 177-188.
[2] 赵勇. PDSOFT 3Dpiping 管道预制设计系统-在管道预制安装过程中的应用 [J]. 石油化工建设, 2007, 29(1): 24-27. ZHAO Yong. PDSOFT 3DPiping design system-An application to the construction process of a prefabricated pipe project [J]. Petroleum and Chemical Construction, 2007, 29(1): 24-27. (in Chinese)
[3] Nahangi M, Haas C T. Automated 3D compliance checking in pipe spool fabrication [J]. Advanced Engineering Informatics, 2014, 28: 360-369.
[4] Degrande V, Nervik A, Fogg D, et al. Fabrication of large-diameter, thick-walled pipe to meet special fault- crossing design requirements for San Francisco Hetch Hetchy Water System [C]// Proceedings of the Pipelines 2013 Conference. Fort Worth, USA: ASCE Press, 2013: 576-587.
[5] 何涛, 李士才, 孙钦伟, 等. 面向设计制造一体化的管道预制管理信息系统 [J]. 计算机辅助设计与图形学学报, 2004, 16(11): 1613-1616.HE Tao, LI Shicai, SUN Qinwei, et al. Piping prefabrication management information system for integrated design and construction [J]. Journal of Computer Aided Design & Computer Graphics, 2004, 16(11): 1613-1616. (in Chinese)
[6] 张存贵. 管道工厂化预制技术在建筑机电安装中的应用 [J]. 山西建筑, 2011, 37(29): 96-97.ZHANG Cungui. Application of pipeline factory prefabrication in building mechanical and electric installation [J]. Shanxi Architecture, 2011, 37(29): 96-97. (in Chinese)
[7] Korman T M. Integrating Multiple Products over Their Life Cycle: An Investigation of Mechanical, Electrical, and Plumbing Coordination [D]. Stanford, USA: Stanford University, 2001.
[8] 张建平, 余芳强, 李丁. 面向建筑全生命期的集成 BIM 建模技术研究 [J]. 土木建筑工程信息技术, 2012 (1): 6-14.ZHANG Jianping, YU Fangqiang, LI Ding. Building lifecycle oriented BIM integration modeling technology research [J]. Journal of Information Technology in Civil Engineering and Architecture, 2012 (1): 6-14. (in Chinese)
[9] 刘晴, 王建平. 基于BIM技术的建设工程生命周期管理研究 [J]. 土木建筑工程信息技术, 2010 (3): 40-45.LIU Qing, WANG Jianping. The research of BIM-based technology for the construction project lifecycle management [J]. Journal of Information Technology in Civil Engineering and Architecture, 2010 (3): 40-45. (in Chinese)
[10] Tatum C B, Korman T. Coordinating building systems: Process and knowledge [J]. Journal of Architectural Engineering, 2000, 6(4): 116-121.
[11] Eastman C. General purpose building description systems [J]. Computer-Aided Design, 1976, 8(1): 17-26.
[12] Sciences N I O B. National building information modeling standard: Verion1-Part1 [E/OL]. (2015-01-22), http:// www.wbdg.org/pdfs/NBIMSv1_p1.pdf 2007.
[13] 张建平. BIM 技术的研究与应用 [J]. 施工技术, 2011 (2): 15-18.ZHANG Jianping. The research and application of BIM technology [J]. Construction Technology, 2011 (2): 15-18. (in Chinese)
[14] 胡振中, 陈祥祥, 王亮, 等. 基于BIM的机电设备智能管理系统 [J]. 土木建筑工程信息技术, 2013, 5(1): 17-21.HU Zhenzhong, CHEN Xiangxiang, WANG Liang, et al. A BIM-based facility intelligent management system [J]. Journal of Information Technology in Civil Engineering and Architecture, 2013, 5(1): 17-21. (in Chinese)
[15] 余杰, 吕品, 郑昌文. Delaunay 三角网构建方法比较研究 [J]. 中国图象图形学报, 2010, 15(8): 1158-1167.YU Jie, LV Ping, ZHENG Changwen. A comparative research on methods of Delaunay triangulation [J]. Journal of Image and Graphics, 2010, 15(8): 1158-1167. (in Chinese)
[16] Lee D T, Schachter B J. Two algorithms for constructing a delaunay triangulation [J]. International Journal of Computer and Information Sciences, 1980, 9(3): 219-242.
[17] Miles R E. Probability distribution of a network of triangles [J]. Society for Industrial and Applied Mathematics, 1969, 11(3): 399-402.