Abstract:Effective surface rock grouting and effective coupling between the concrete-cover grouting and concrete construction are difficult problems, especially with complex geological conditions. This study analyzed the complex geological conditions of the Baihetan dam foundation to develop a consolidation grouting method using the reserved rock mass cover weight, a low pressure thick slurry seal and consolidation grouting by the cover weight by controlling various parameters including the reserved rock mass cover weight, the grouting pressure and concentration, and the grouting method and materials. This method not only avoids the problems of conventional consolidation grouting methods, but also protects the crane beach dam foundation thin layer breccia lava and stabilizes the basalt columnar joints by consolidation grouting bare unloading relaxation. The practice of the riverbed dam section of the Baihetan dam engineering showed that the pass rate of the permeability rate of inspection holes is 99.3%, the high wave velocity of all kinds of lithology measuring point was 91.8%-93.3%, and the low wave velocity measuring point accounted for 2.0%-2.9%, which met the overall design requirements. The results can be applied to the design of consolidation grouting methods in similar projects.
罗贯军, 王克祥, 郭增光, 谭尧升, 阿旺加措. 复杂河床坝基岩体盖重固结灌浆关键技术[J]. 清华大学学报(自然科学版), 2020, 60(7): 575-581.
LUO Guanjun, WANG Kexiang, GUO Zengguang, TAN Yaosheng, AWANG Jiacuo. Consolidation grouting methods for riverbed rock mass coverings of complex dam foundations. Journal of Tsinghua University(Science and Technology), 2020, 60(7): 575-581.
[1] 李瓒, 陈飞, 郑建波, 等. 特高拱坝枢纽分析与重点问题研究[M]. 北京:中国电力出版社, 2004.LI Z, CHEN F, ZHENG J B, et al. Analysis and key problems of super high arch dam hub[M]. Beijing:China Electric Power Press, 2004. (in Chinese) [2] LIN P, ZHU X, LI Q, et al. Study on optimal grouting timing for controlling uplift deformation of a super high arch dam[J]. Rock Mechanics and Rock Engineering, 2016, 49(1):115-142. [3] American Society of Civil Engineers. Foundations for dams[M]. New York:American Society of Civil Engineers, 1974. [4] LIN P, ZHOU W Y, LIU H Y. Experimental study on cracking, reinforcement, and overall stability of the Xiaowan super-high arch dam[J]. Rock Mechanics and Rock Engineering, 2015, 48(2):819-841. [5] 樊启祥, 周绍武, 李炳锋. 溪洛渡特高拱坝建设的岩石工程关键技术[J]. 岩石力学与工程学报, 2012, 31(10):1998-2015.FAN Q X, ZHOU X W, LI B F. Key technologies of rock engineering for construction of Xiluodu super-high arch dam[J]. Journal of Rock Mechanics and Engineering, 2012, 31(10):1998-2015. (in Chinese) [6] 王仁坤, 林鹏. 溪洛渡拱坝建基面嵌深优化的分析与评价[J]. 岩石力学与工程学报, 2008, 27(10):2010-2018.WANG Z K, LIN P. Analysis and evaluation of optimizing design for foundation excavation of Xiluodu super-high arch dam[J]. Journal of Rock Mechanics and Engineering, 2008, 27(10):2010-2018. (in Chinese) [7] 林鹏, 康绳祖, 李庆斌, 等. 溪洛渡拱坝施工期岩体质量评价与大坝稳定分析[J]. 岩石力学与工程学报, 2012, 31(10):2042-2052.LIN P, KANG S Z, LI Q B, et al. Evaluation of rock mass quality and stability analysis of Xiluodu arch dam under construction phase[J]. Journal of Rock Mechanics and Engineering, 2012, 31(10):2042-2052. (in Chinese) [8] 陈长久, 安雪晖, 金峰, 等. 自流可控灌浆技术的开发与应用[J]. 清华大学学报(自然科学版), 2014, 54(8):1013-1017.CHEN C J, AN X H, JIN F, et al. Development and application of self-folwing controlled grouting[J]. Journal of Tsinghua University (Science and Technology). 2014. 54(8):1013-1017. (in Chinese) [9] 张劲青, 刘刚. 二滩拱坝基础固结灌浆施工和质量控制[J]. 水电站设计, 2007, 23(2):88-92.ZHANG J Q, LIU G. Construction and quality control of consolidation grouting of Ertan arch dam foundation[J]. Design of Hydroelectric Power Station, 2007, 23(2):88-92. (in Chinese) [10] 白俊光, 李蒲健, 武志刚, 等. 拉西瓦水电站枢纽关键技术[J], 水力发电, 2009, 35(11):10-11, 15.BAI J G, LI P J, WU Z G, et al. Key technologies in the construction of Laxiwa Hydropower Station[J]. Water Power, 2009, 35(11):10-11, 15.(in Chinese) [11] 杨世伟, 李德勇. 锦屏一级水电站坝基无盖重固结灌浆施工工艺探讨[J]. 探矿工程(岩土钻掘工程), 2011, 38(8):56-58, 63.YANG S W, LI D Y. Discussion on construction technology of consolidation grouting without concrete covering for dam foundation in Jinping I Hydropower Station[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2011, 38(8):56-58, 63. (in Chinese) [12] 周素丽, 许常玉, 张晓明. 小湾水电站坝基固结灌浆施工质量控制[J]. 水力水电施工, 2012, 134(5):96-101.ZHOU S L, XU C Y, ZHANG X M. Quality control of consolidation grouting construction for dam foundation of Xiaowan Hydropower Station[J]. Hydraulic and Hydroelectric Construction, 2012, 134(5):96-101. (in Chinese) [13] 王毅, 杨建宏. 溪洛渡水电站河床坝基固结灌浆与检测评价[J]. 工程地质学报, 2015, 23:499-504.WANG Y, YANG J H. The test and assessment of consolidation grouting in river bed dam foundation of Xiluodu Hydropower Station[J]. Journal of Engineering Geology. 2015, 23:499-504. (in Chinese) [14] 张劲青, 刘刚. 溪洛渡水电站拱坝左右岸坝肩槽开挖的质量控制[J]. 水电站设计, 2012, 28(1):96-101.ZHANG J Q, LIU G. Quality control of excavation of abutment trench on left and right bank of arch dam of Xiluodu Hydropower Station[J]. Design of Hydroelectric Power Station, 2012, 28(1):96-101. (in Chinese) [15] 石安池, 唐鸣发, 周其健. 金沙江白鹤滩水电站柱状节理玄武岩岩体变形特性研究[J]. 岩石力学与工程学报, 2008, 27(10):2079-2086.SHI A C, TANG M F, ZHOU Q J. Research of deformation characteristics of columnar jointed basalt at Baihetan Hydropower Station on Jinsha River[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(10):2079-2086. (in Chinese) [16] 樊启祥, 张春生, 汪志林, 等. 白鹤滩水电站特高拱坝复杂坝基开挖保护与处理关键技术成果报告[R]. 北京:中国长江三峡集团有限公司, 2016.FAN Q X, ZHANG C S, WANG Z L, et al. Report on key technologies for excavation protection and treatment of complex dam foundation of super-high arch dam of Baihetan Hydropower Station.[R]. Beijing:China Three Gorges Corporation, 2016. (in Chinese)