LIU Youzhi1, ZHANG Guoxin1, TAN Yaosheng2, LIU Chunfeng2, GONG Pan2, PEI Lei2
1. China Institute of Water Conservancy and Hydropower Research, Beijing 100038, China; 2. China Three Gorges Projects Development Co., Ltd., Chengdu 610041, China
Abstract:The Wudongde and Baihetan arch dams are two super high arch dams under construction at the same time in China. The dam site is located in the windy, dry, hot Jinsha River valley. The dams are made of low-heat cement. This project models the temperature control and crack prevention during the pouring process, the dam and foundation deformation control with water storage, and the safety of long-term operation. This article focuses on the key technical issues involved in simulating the dam construction process with the intelligent construction system used for these dams, the key problems in the simulation dam construction process, and the key points in creating dam construction simulations. The experience gained in developing these two engineering dam simulation was used to identify the problems that need to be solved for future projects.
刘有志, 张国新, 谭尧升, 刘春风, 龚攀, 裴磊. 仿真大坝建设关键技术与实践应用[J]. 清华大学学报(自然科学版), 2021, 61(7): 714-723.
LIU Youzhi, ZHANG Guoxin, TAN Yaosheng, LIU Chunfeng, GONG Pan, PEI Lei. Key techniques for dam construction simulations. Journal of Tsinghua University(Science and Technology), 2021, 61(7): 714-723.