1. State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beijing 100084, China 2. Project Management and Technology Institute, Tsinghua University, Beijing 100084, China 3.China International Water and Electric Investment Corporation,China Three Gorges, Beijing 100033, China
This paper reports on a fieldwork survey involving two hydropower projects in Southwestern China. Specifically, the perspectives of officials handling the land acquisition and their influence on migrant satisfaction are examined. Data collected from 120 migrants and 74 officials in Guizhou Province showed 10 factors that significantly impact migrant satisfaction. There is a positive correlation between the perspectives of the officials and migrant satisfaction for most of the factors. However, public service, payment of funding, and culture and tradition are exceptions caused by unsuitable resettlement mechanisms. These exceptions indicate that resettlement policies and mechanisms should be better designed to meet the requirements of local conditions.
陈文超,强茂山,王佳宁,郑腾飞. 水库移民管理者的认知对移民满意度的影响[J]. 清华大学学报(自然科学版), 2015, 55(1): 46-49.
Wenchao CHEN,Maoshan QIANG,Jianing WANG,Tengfei ZHENG. Perspectives of officials in land acquisition for hydropower projects and their influence on migrant satisfaction. Journal of Tsinghua University(Science and Technology), 2015, 55(1): 46-49.
汪恕诚. 论大坝与生态[J]. 水利发电, 2004, 30(4): 1-4, 14. WANG Shucheng. On dams and ecology[J]. Water Power, 2004, 30(4): 1-4, 14.(in Chinese)
[2]
樊启祥, 陆佑楣. 西部水力资源开发的项目管理[J]. 中国工程科学, 2010, 12(8): 30-35. FAN Qixiang, LU Youmei. Project management of hydropower resource development in western China[J]. Engineering Sciences, 2010, 12(8): 30-35.(in Chinese)
[3]
Cernea M M. The risks and reconstruction model for resettling displaced populations[J]. World Development, 1997, 25: 1569-1587.
[4]
Cernea M M, Mcdowell C. Risks and Reconstruction: Experience of Resettlers and Refugees[M]. Washington DC, USA: World Bank, 2000.
[5]
Scoones I. Sustainable Rural Livelihoods: A Framework for Analysis, IDS Working Paper 72 [R]. Brighton, UK: University of Sussex, 1998.
[6]
McDowell C. Involuntary resettlement, impoverishment risks and sustainable livelihoods [Z/OL]. (2013-03-01), http://www.massey.ac.nz/~trauma/issues/2002-2/mcdowell.htm.
[7]
Fuggle R, Smith W T. Large Dams in Water and Energy Resource Development in the People's Republic of China (PRC). WCD Country Review Paper[M]. Cape Town, The Republic of South Africa: Hydrosult Canada Inc., 2000.
[8]
Wilmsen B. Progress, problems, and prospects of dam-induced displacement and resettlement in China[J]. China Information, 2011, 25(2), 139-164.
[9]
Wilmsen B, Webber M, DUAN Yuefang. Involuntary rural resettlement resources, strategies, and outcomes at the Three Gorges Dam, China[J]. Journal of Environment & Development, 2011, 20(4), 355-380.
[10]
陈绍军, 施国庆. 中国非自愿移民的贫困分析[J]. 甘肃社会科学, 2003(5): 114-116. CHEN Shaojun, SHI Guoqing. Impoverishment of involuntary resettlement in China[J]. Gansu Social Sciences, 2003(5): 114-116.(in Chinese)
[11]
朱东恺, 施国庆, 张彬. 水利水电工程移民问题的经济学研究现状与展望[J]. 中国软科学, 2005, 3: 55-60. ZHU Dongkai, SHI Guoqing, ZHANG Bin. Present condition and perspective of economic research on resettlement issues induced by hydropower project[J]. China Soft Science, 2005, 3: 55-60.(in Chinese)
[12]
严登才, 施国庆. 水库建设对移民可持续生计的影响及重建路径[J]. 水利发展研究, 2011(6): 49-53. YAN Dengcai, SHI Guoqing. Reconstruction of sustainable livelihoods of reservoirmigrants[J]. Water Resources Development Research, 2011(6): 49-53.(in Chinese)