Abstract:The actual communication relationships among construction project members are identified from data extracted from the e-mail base of an actual construction project with semantic labeling which excludes the impact of subjectivity in questionnaires used in existing studies. The data is used to build social network analysis models for different issues to analyse the relationships between the organization-fit and equipment procurement delays with the models verified by experts from the project. The results show that the decision power, experience and communication abilities of the members all affect equipment procurement delays. This communication network model developed using semantic labeling can identify communication network information missed in subjective evaluations.
[1] 房燕玲,汤志卫,孙品洁,等.加强沟通促进设备管理[J].中国医院,2004,8(11):68-69.FANG Yanling,TANG Zhiwei,SUN Pinjie,et al.Improving the work of communication and pushing on the management of equipment[J].Chinese Hospitals,2004,8(11):68-69.(in Chinese)
[2] Kristof A L.Person-organization fit:An integrative review of its conceptualizations,measurement,and implications[J].Personnel Psychology,1996,49(1):1-49.
[3] Liao P C,Lei G,Xue J W,et al.Influence of person-organizational fit on construction safety climate[J].Journal of Management in Engineering,2013,31(4):04014049.
[4] 王萍.人与组织匹配的理论与方法的研究[D].武汉:武汉理工大学,2007.WANG Ping.Research on Theory and Methodology of Person-organization Fit[D].Wuhan:Wuhan University of Technology,2007.(in Chinese)
[5] 彭玉石.基于主成分分析的建设工程项目延期影响因素研究[D].重庆:重庆大学,2014.PENG Yushi.Construction Projects Delayed Influencing Factors Analysis Based on Principal Component Analysis[D].Chongqing:Chongqing University,2014.(in Chinese)
[6] 赵振智,姚文俊.探析现代项目管理中的沟通问题及对策[J].中国建设信息,2007(20):64-66.ZHAO Zhenzhi,YAO Wenjun.Research on communication problem and solution in modern project management[J].Information of China Construction,2007(20):64-66.(in Chinese)
[7] 刘靖,黄有亮.EPC总承包项目采购管理中信息沟通问题研究[J].建筑管理现代化,2007(6):13-16.LIU Jing,HUANG Youliang.Study on information communication of procurement management in EPC general contract project[J].Construction Management Modernization,2007(6):13-16.(in Chinese)
[8] 李云峰.BIue-M芯片烘烤设备升级项目的沟通计划编制[D].上海:复旦大学,2011.LI Yunfeng.BIue-M Equipment Upgrade Communication Planning[D].Shanghai:Fudan University,2011.(in Chinese)
[9] Allen T J,Lee D,Tushman M L.R&D performance as a function of internal communication,project management,and the nature of the work[J].IEEE Transactions on Engineering Management,1980,27(1):2-12.
[10] Katz R.The effects of group longevity on project communication and performance[J].Administrative Science Quarterly,1982,27(1):81-104.
[11] Pryke S D.Analysing construction project coalitions:Exploring the application of social network analysis[J].Construction Management and Economics,2004,22(8):787-797.
[12] Chinowsky P,Diekmann J,Galotti V.Social network model of construction[J].Journal of Construction Engineering and Management,2008,134(10):804-812.
[13] Ellmann S.Management of complex projects:Invisible structures,coordination and recommendations for management[C]//Proceedings of the 22nd IPMA World Congress.Rome,Italy:Animp Servizi Srl,2008:127-132.
[14] Golbeck J,Hendler J A.Reputation network analysis for email filtering[C]//Proceedings of the 1st Conference on Email and Anti-Spam,Mountain View.Mountain View,California,USA:Citeseer,2004.
[15] Bird C,Gourley A,Devanbu P,et al.Mining email social networks[C]//Proceedings of the 2006 International Workshop on Mining Software Repositories.Shanghai,China:ACM,2006:137-143.
[16] 郭绍忠,段丹,刘晓楠,等.邮件挖掘技术在社会网络分析中的研究与应用[J].计算机工程与设计,2008,29(9):2339-2341.GUO Shaozhong,DUAN Dan,LIU Xiaonan,et al.Research and application of email mining in social network analysis[J].Computer Engineering and Design,2008,29(9):2339-2341.(in Chinese)
[17] Haythornthwaite C.Social network analysis:An approach and technique for the study of information exchange[J].Library&Information Science Research,1996,18(4):323-342.
[18] 刘军.社会网络分析导论[M].北京:社会科学文献出版社,2004.LIU Jun.An Introduction to Social Network Analysis[M].Beijing:Social Science Academic Press,2004.(in Chinese)
[19] Yang R J,Zou P X W.Stakeholder-associated risks and their interactions in complex green building projects:A social network model[J].Building and Environment,2014,73(1):208-222.
[20] 潘菊英,刘可静.信息沟通原理在现代图书馆管理中的运用[J].情报理论与实践,2003,26(2):149-151.PAN Juying,LIU Kejing.The application of information communication theory in the management of a modern library[J].Information Studies:Theory&Application,2003,26(2):149-151.(in Chinese)