Abstract:Shield jamming is an important engineering geological problem that restricts safe, efficient construction of double-shield tunnels by tunnel boring machines (TBMs). Many factors influence shield jamming with numerical simulations needed to analyze the influences of these many factors. This study used numerical simulations of the tunneling process of a double shield TBM. The simulations use the creep model based on internal variable thermodynamics theory to simulate the time-dependent deformation of the surrounding rock and the interactions between the surrounding rock and the shield. The simulations were used to analyze the influence of two shield jamming control factors, the TBM advance rate and the overcut, for a highway tunnel. The results show that increasing the advance rate somewhat reduces the contact force and the shield jamming risk. The overcut has a larger effect on the contact force. Careful use of these two shield jamming control measures is more important for tunnel construction with high ground stresses and soft rock conditions. These results provide a reference for shield jamming risk analyses and optimizing the TBM parameters such as the advance rate and the overcut.
[1] LIU Y R, HOU S K, LI C Y, et al. Study on support time in double-shield TBM tunnel based on self-compacting concrete backfilling material[J]. Tunnelling and Underground Space Technology, 2020, 96:103212. [2] 尚彦军, 杨志法, 曾庆利, 等. TBM施工遇险工程地质问题分析和失误的反思[J]. 岩石力学与工程学报, 2007, 26(12):2404-2411.SHANG Y J, YANG Z F, ZENG Q L, et al. Retrospective analysis of TBM accidents from its poor flexibility to complicated geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(12):2404-2411. (in Chinese) [3] FARROKH E, MORTAZAVI A, SHAMSI G. Evaluation of ground convergence and squeezing potential in the TBM driven Ghomroud tunnel project[J]. Tunnelling and Underground Space Technology, 2006, 21(5):504-510. [4] 王焕明, 陈方明. 复杂地质区TBM卡机成因分析及脱困技术[J]. 人民长江, 2014, 45(3):66-69.WANG H M, CHEN F M. Cause analysis on TBM jam accident in adverse geological strata and jam-removing techniques[J]. Yangtze River, 2014, 45(3):66-69. (in Chinese) [5] RAMONI M, ANAGNOSTOU G. The interaction between shield, ground and tunnel support in TBM tunnelling through squeezing ground[J]. Rock Mechanics and Rock Engineering, 2011, 44(1):37-61. [6] AYDAN Ö, AKAGI T, KAWAMOTO T. The squeezing potential of rock around tunnels:Theory and prediction with examples taken from Japan[J]. Rock Mechanics and Rock Engineering, 1996, 29(3):125-143. [7] CARRANZA-TORRES C, FAIRHURST C. Application of the convergence-confinement method of tunnel design to rock masses that satisfy the Hoek-Brown failure criterion[J]. Tunnelling and Underground Space Technology, 2000, 15(2):187-213. [8] 温森, 徐卫亚. 洞室变形引起的双护盾TBM施工事故风险分析[J]. 岩石力学与工程学报, 2011, 30(S1):3060-3065.WEN S, XU W Y. Risk analysis of double shield TBM construction accident induced by tunnel deformation[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(S1):3060-3065. (in Chinese) [9] ZHANG J Z, ZHOU X P. Time-dependent jamming mechanism for single-shield TBM tunneling in squeezing rock[J]. Tunnelling and Underground Space Technology, 2017, 69:209-222. [10] HASANPOUR R, SCHMITT J, OZCELIK Y, et al. Examining the effect of adverse geological conditions on jamming of a single shielded TBM in Uluabat tunnel using numerical modeling[J]. Journal of Rock Mechanics and Geotechnical Engineering, 2017, 9(6):1112-1122. [11] 黄兴, 刘泉声, 彭星新, 等. 引大济湟工程TBM挤压大变形卡机计算分析与综合防控[J]. 岩土力学, 2017, 38(10):2962-2972.HUANG X, LIU Q S, PENG X X, et al. Analysis and comprehensive prevention-control for TBM jamming induced by squeezing deformation of surrounding rock around water diversion tunnel from Datong river into Huangshui river[J]. Rock and Soil Mechanics, 2017, 38(10):2962-2972. (in Chinese) [12] 程建龙, 杨圣奇, 杜立坤, 等. 复合地层中双护盾TBM与围岩相互作用机制三维数值模拟研究[J]. 岩石力学与工程学报, 2016, 35(3):511-523.CHENG J L, YANG S Q, DU L K, et al. Three-dimensional numerical simulation on interaction between double-shield TBM and surrounding rock mass in composite ground[J]. Chinese Journal of Rock Mechanics and Engineering, 2016, 35(3):511-523. (in Chinese) [13] 尚彦军, 史永跃, 曾庆利, 等. 昆明上公山隧道复杂地质条件下TBM卡机及护盾变形问题分析和对策[J]. 岩石力学与工程学报, 2005, 24(21):3858-3863.SHANG Y J, SHI Y Y, ZENG Q L, et al. TBM jamming and deformation in complicated geological conditions and engineering measures[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(21):3858-3863. (in Chinese) [14] 徐鹏. 深部复合岩层流变力学行为及其对TBM卡机灾害影响机理研究[D]. 北京:中国矿业大学, 2018.XU P. Study on rheological behavior of deep buried composite rock and its influencing mechanism on TBM jamming disaster[D]. Beijing:China University of Mining and Technology, 2018. (in Chinese) [15] LI C Y, HOU S K, LIU Y R, et al. Analysis on the crown convergence deformation of surrounding rock for double-shield TBM tunnel based on advance borehole monitoring and inversion analysis[J]. Tunnelling and Underground Space Technology, 2020, 103:103513. [16] 温森, 杨圣奇, 董正方, 等. 深埋隧道TBM卡机机理及控制措施研究[J]. 岩土工程学报, 2015, 37(7):1271-1277.WEN S, YANG S Q, DONG Z F, et al. TBM jamming mechanism and control measures in deep buried tunnels[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(7):1271-1277. (in Chinese) [17] ZHAO K, JANUTOLO M, BARLA G. A completely 3D model for the simulation of mechanized tunnel excavation[J]. Rock Mechanics and Rock Engineering, 2012, 45(4):475-497. [18] SUN B, YANG S. An improved 3D finite difference model for simulation of double shield TBM tunnelling in heavily jointed rock masses:The DXL tunnel case[J]. Rock Mechanics and Rock Engineering, 2019, 52:2481-2488. [19] VLACHOPOULOS N, DIEDERICHS M S. Improved longitudinal displacements profiles for convergence confinement analysis of deep tunnel[J]. Rock Mechanics and Rock Engineering, 2009, 42(2):131-146. [20] ZHANG L, LIU Y R, YANG Q, et al. Study on time-dependent behavior and stability assessment of deep-buried tunnels based on internal state variable theory[J]. Tunnelling and Underground Space Technology, 2016, 51:164-174. [21] 张泷. 基于内变量热力学的流变模型及岩体结构长期稳定性研究[D]. 北京:清华大学, 2015.ZHANG L. Research on rheological model based on thermodynamics with internal state variables and long-term stability of rock mass structures[D]. Beijing:Tsinghua University, 2015. (in Chinese) [22] HASANPOUR R, ROSTAMI J, VNVER B. 3D finite difference model for simulation of double shield TBM tunneling in squeezing grounds[J]. Tunnelling and Underground Space Technology, 2014, 40:109-126. [23] 刘泉声, 黄兴, 时凯, 等. 深部挤压性地层TBM掘进卡机孕育致灾机理[J]. 煤炭学报, 2014, 39(S1):75-82.LIU Q S, HUANG X, SHI K, et al. The mechanism of TBM shield jamming disaster tunnelling through deep squeezing ground[J]. Journal of China Coal Society, 2014, 39(S1):75-82. (in Chinese) [24] Itasca Consulting Group, Inc. Fast Lagrangian analysis of continua in 3 dimensions, version 2.0, volume V:Appendices[R]. Itasca Consulting Group, Inc., 1997. [25] DAY R A, POTTS D M. Zero thickness interface elements-numerical stability and application[J]. International Journal for Numerical and Analytical Methods in Geomechanics, 1994, 18(10):689-708.