中国地下工程事故成因及应对策略
魏雪斐, 段云岭, 乔楠, 冯金铭     
清华大学 水沙科学与水利水电工程国家重点实验室, 北京 100084
摘要:中国地下工程设计建设中,新奥法使用占很大比重,其核心要点是:1)减少应力扰动;2)及时施加柔性支护;3)受力圈封闭;4)监控量测。Barton总结出岩体质量指标Q值与洞室开挖跨度和支护类型之间的关系,与中国地下工程建设规范相近。该文统计了50起中国采用新奥法的地下工程塌方事故,发现在Ⅴ级围岩中采用强支护发生事故的比例极高,而强支护方式已不属于新奥法核心理念,可见人们对新奥法的认识和理解还存在偏差。事故原因主要是对均质岩体最优断面及支护型式认识不足,没有采取破碎带局部补强方式让围岩形成环向压缩稳定变形,渗漏封堵没有以补强为根本,支护时机选择不到位,对掌子面前方岩体预测手段和设备不够完善等。最后提出应尽量避免在Ⅴ级围岩中开挖洞室,遇到断层破碎带要在其上注浆提高其强度,尽快封闭断面形成围岩主动承载体系等措施。
关键词新奥法    隧道    塌方    注浆    岩体补强    
Causes and countermeasures of accidents related to underground construction in China
WEI Xuefei, DUAN Yunling, QIAO Nan, FENG Jinming     
State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beijing 100084, China
Abstract: The Austrian tunneling method (NATM) is being used to construct underground structures in China. The methods main points are to 1) reduce the stresses, 2) provide appropriate flexible supports, 3) seal the stress sphere and 4) provide monitoring and measurements. Barton summarized the relationship between the rock mass quality index, Q, and the cavern excavation span and support type. Chinese construction specifications for underground excavations are similar; however, there have been 50 collapses of underground projects using the NATM method in China with this study indicating that many of the accidents were using strong supports in Ⅴ-class wall rock even though such strong supports are not recommended NATM core supports. This indicates that designers do not fully understand NATM including a lack of knowledge of the optimal section and support types for the intact rock type, failure to use local reinforcement for fractured zones to form stable circumferential deformation of the wall rock, and failure to use reinforcements to block leaks as well as improper selection of support installations, inaccurate design predictions, and inappropriate equipment for the working face rock. The suggested countermeasures include avoiding excavating caverns in Ⅴ-class wall rock, quickly grouting fractured zones to improve the rock mass strength in fractured zones, and sealing sections as quickly as possible.
Key words: new Austrian tunneling method     tunnel     collapse     grouting     rock mass reinforcement    

据2017年国家安全生产应急救援指挥中心通报,2013年至今,中国共发生隧道施工类事故(事件)39起,造成107人遇难、204人遇险[1]。另据统计,截至2016年底,中国已投入运营的各类型隧道及地下工程数据如表 1所示。

表 1 2016年中国已建地下工程统计表[2-6]
地下工程类型 工程量
铁路隧道 14 120.0 km
公路隧道 14 039.7 km
城市地铁 3 168.7 km
水工隧洞 10 000.0 km
储气洞库(含盐穴储库) 426.76×108 m3
储油洞库 300×104 m3

在中国大力发展地下工程建设的同时,事故的发生也为国家和人民敲响了警钟。在地下工程的设计建设过程中,新奥法的使用占很大比重,其主要思想是通过合理的开挖与支护,充分发挥围岩的自承能力[7],但目前仍然没有公认的新奥法完整定义。本文归纳为以下4点:

1) 减少应力扰动:主要指减少洞室开挖对周围岩体的应力扰动。不同质量等级的均质岩体,都对应具有最优洞室断面,包括最优形状、最优洞径等,断面设计时应尽量控制在最优断面范围内,施工过程中还应避免超挖欠挖,以防产生单洞局部应力过于集中;对于多洞室布置,则应避免洞间岩壁内的应力峰值过多叠加,从而加剧围岩内的应力集中。

2) 及时施加柔性支护:断面开挖后及时施加短锚杆及表面喷混凝土等柔性支护,一方面保护新揭露的围岩避免风化、流水等侵蚀,另一方面使短锚杆所在的浅层作用圈随围岩一同变形;而非通过施加长锚杆及刚性支撑等手段限制围岩变形。

3) 受力圈封闭:洞室开挖后,断面围岩向洞内位移,环向压缩逐步建立压应力进而阻止径向位移继续发展,形成稳定封闭的受力圈。当岩壁环向岩体质量分布不均,如存在软弱部位时,该处压缩变形过大而引起岩壁环向撕裂以及径向错动,难以建立环向压应力形成稳定封闭受力圈。这种局部环向压缩变形过大而引起的围岩失稳,可以称为洞室断面非一致环向压缩变形失稳。因此为了形成封闭的受力圈,就要保证开挖后对洞室围岩内软弱部位及时进行处理减少其压缩变形,避免出现非一致环向压缩变形。

4) 监控量测:爆破后应立即实施对围岩及支护的监控量测,尽早发现围岩出现的非一致环向压缩变形等隐患,以便及时采取应对措施,保证围岩安全。

新奥法是20世纪60—70年代首先由Rabcewiz提出的[8-9],国内最早在20世纪70年代对新奥法进行了介绍[10]。1979年11月竣工的皖赣铁路下坑隧道首次应用新奥法取得了成功经验[11]。北京地铁自1987年首次采用新奥法设计施工北京复兴门地铁站及折返线工程,车站跨度达26 m。之后利用新奥法原理修建地铁已成为一种主要施工方法,如广州地铁二号线越秀公园站及南京地铁一期工程南京火车站等[12]

本文通过统计中国采用新奥法施工的地下工程塌方事故,从中发现事故产生的规律,分析造成事故的原因并提出相应的措施,为地下工程设计施工提供参考。

1 地下工程事故统计

本文收集了1985—2017年发生的50起采用新奥法建设的地下工程塌方事故,如表 2所示。其中铁路隧道24座,公路隧道22座,水工隧洞3座,城市地铁1座。

表 2 隧道塌方事故统计表
编号 塌方隧道 地点 隧道类型
1 公山隧道[13] 广通—昆明 铁路隧道
2 大岭铺隧道[14] 安阳 铁路隧道
3 侯家湾四号隧道[15] 昭通彝良县 铁路隧道
4 岩顶隧道[16-17] 泉州 铁路隧道
5 新会龙场隧道[18] 马角坝—广元 铁路隧道
6 田坝子隧道[19] 水富—昭通 铁路隧道
7 新太阳冲隧道[20] 玉屏县—镇远县 铁路隧道
8 草庵隧道[21-24] 威舍—昆明 铁路隧道
9 张盘隧道[25] 宝鸡—中卫 铁路隧道
10 刺桐关三号隧道[26] 昆阳—玉溪 铁路隧道
11 殿沟隧道[27] 安康 铁路隧道
12 赵家二号隧道[28] 王家湾—涿鹿 铁路隧道
13 西坪隧道[29-31] 天水 铁路隧道
14 东风隧道[32-35] 龙宮—北大牛 铁路隧道
15 老营盘隧道[36] 吉安市 铁路隧道
16 寺铺尖隧道[37] 五台县 铁路隧道
17 秦岭隧道Ⅱ线[38-42] 青岔—营盘 铁路隧道
18 桃树坪隧道[43-44] 兰州 铁路隧道
19 小盘岭1号隧道[45-46] 珲春 铁路隧道
20 小平羌隧道[47-49] 山丹军马场 铁路隧道
21 那适2号隧道[50] 宾阳 铁路隧道
22 包西铁路双线隧道[51] 鄂尔多斯 铁路隧道
23 红豆山隧道[52] 临沧 铁路隧道
24 曼么一号隧道[53] 西双版纳 铁路隧道
25 慈母山一号隧道[54-55] 重庆 公路隧道
26 沙赫里斯坦隧道[56] 塔吉克斯坦(中国建) 公路隧道
27 靠椅山隧道[57] 翁源县 公路隧道
28 缙云山隧道[58] 重庆 公路隧道
29 飞鸾岭隧道[59] 福州—宁德 公路隧道
30 青岭隧道[60] 海南省 公路隧道
31 叉河岭隧道[61] 舟山 公路隧道
32 白花山隧道[62] 虎门 公路隧道
33 蒿庄梁隧道[63] 铜川—黄陵 公路隧道
34 黄土岭隧道[64] 台州 公路隧道
35 白山隧道[65] 韶关—赣州 公路隧道
36 父子关隧道[66] 宜昌 公路隧道
37 乌竹岭隧道[67-69] 金华 公路隧道
38 高阳寨隧道[70-71] 恩施 公路隧道
39 营尔岭隧道[72] 涞源 公路隧道
40 子尹隧道[73] 遵义 公路隧道
41 凉风垭隧道[74-75] 桐梓县 公路隧道
42 隆田隧道[76] 田林县—隆林县 公路隧道
43 丁家湾隧道[77] 南阳—西坪 公路隧道
44 后云台山隧道[78] 连云港 公路隧道
45 迎宾隧道[79-80] 三亚 公路隧道
46 静宁隧道[81-82] 静宁 公路隧道
47 富尔江引水隧洞[83] 辽宁新宾满族自治县 水工隧洞
48 小浪底2#导流洞[84] 济源—孟津 水工隧洞
49 盘道岭隧洞[85] 兰州 水工隧洞
50 西安地铁二号线[86] 西安 城市地铁

Barton在1974年提出Q系统[87],经过1993年、2002年两次修正后趋于完善[88-89],该系统在总结了至少1 262个隧洞工程实例的基础上建立了岩体质量指标Q值与洞室开挖跨度和支护类型之间的关系。

中国公路隧道设计规范(JTG D70-2004)和铁路隧道设计规范(TB 10003-2005)中对于典型洞室所采用的支护方式与Q系统中的支护方式基本吻合,如表 3所示。

表 3 中国隧道典型支护方案表
围岩级别 公路双车道隧道 双线铁路隧道
喷混凝土厚度 锚杆长度 喷混凝土厚度 锚杆长度
cm m cm m
5 2.0
5~8 2.0~2.5 5~8 2.0~2.5
8~12 2.0~3.0 8~10 2.0~2.5
12~15 2.5~3.0 15~22 2.5~3.0
15~25 3.0~4.0 20~25 3.0~3.5

在围岩分级方面,1975年中国发布实施了铁路隧道围岩分级标准,按岩体质量由好到差将隧道围岩分为Ⅰ~Ⅵ级。1995年国家标准《工程岩体分级标准》实施后,按岩体质量由好到差将围岩分为Ⅰ~Ⅴ级,后续的工程岩体评定方法都与1995年国家标准接轨。本文统计的工程案例中有部分采用了年代较早的岩体分级标准,其定性指标以及分级因素与工程岩体分级国家标准基本上是一致的,为了与Q系统进行对应比较,此处做了归一化处理,对照结果如表 4所示。

表 4 岩体分级对照表
Q 1 000~40 40~10 10~1 1~0.1 0.1~0.01 0.01~0.001
Q值分区 A B C~D E F G
1975年隧道围岩分级标准
《工程岩体分级标准》

将50个地下工程塌方实例中塌方位置的岩体质量Q值与开挖洞室跨度之间的关系进行统计,Q值取每个分区内的中间值(例如F区的区间为0.1~0.01,Q值则取0.05),结果如图 1所示。

图 1 塌方洞室跨度与Q值关系图

图 1可以看出,事故发生在Q值在0.1~0.01之间,即国家标准对应的Ⅴ级围岩质量中的事故案例最多,为41起,占事故总数的82%。将其与Barton所给出的支护关系表相对应(1~9区对应不同支护类型,其中8、9区表示支护方案为表面喷15~25 cm厚钢纤维混凝土、1.0~1.3 m间距布置系统长锚杆或置换混凝土支护),如图 2所示。

图 2 塌方洞室与Q系统对应图

图 2可以看出,有40起事故发生在Barton的Q系统8及9区(图中圈内部分),即强支护区,此时采用的强支护方式可以说已不属于新奥法思想中充分发挥围岩自身承载能力的范畴。

另外,从洞室穿过不同地质区段引起塌方的情况来看,由于洞室穿过断层破碎带引起的塌方为13起;由于地下水作用引起的塌方为13起;由于断层破碎带与地下水共同作用引起的塌方达21起,其中较典型的为缙云山隧道,先后通过4个断层破碎带和15个煤矿采空区,最大涌水量达20 000~30 000 m3/d;另外3起为洞段岩体本身处于强风化部位加上支护不及时等人为因素导致的,占比如表 5所示。

表 5 洞室穿过不同地质区段造成塌方占比
地质区段 占比/%
破碎带 26
地下水 26
破碎带+地下水 42
其他 6

从塌方发生的位置来看,发生在掌子面10 m以内的塌方为22起,发生在初期支护与二次衬砌阶段的塌方案例为24起,发生在支护结束或距掌子面100 m以上的塌方4起,占比如表 6所示。

表 6 塌方与掌子面位置关系占比
位置 占比/%
掌子面附近 44
初期支护与二衬之间 48
支护结束 8

对隧道发生塌方的次数进行统计,发生1次塌方的案例占56%,发生2次塌方的占18%,发生3次及以上塌方的案例占26%,如表 7所示。

表 7 工程中塌方次占比
塌方次数 占比/%
1次 56
2次 18
3次及以上 26

2 成因分析

虽然以上工程都采用了新奥法进行设计及施工,但从事故发生的结果来看,人们对新奥法理念的认识和理解还存在一些偏差。

2.1 最优断面及支护型式

图 2可以看出,80%的事故发生在洞室跨度为5~18 m范围、围岩质量等级为Ⅴ级或更差的岩体中,Q系统推荐的岩体支护类型中这部分洞室需要采用强支护。

若单从弹塑性力学理论上来讲,在均匀介质中开挖,圆形的孔洞是避免应力集中最理想的断面[90-91],国内外也有很多学者如Bjorkman等[92]、Richards等[93]、孙焕纯等[94]、薛玺成等[95]等研究了洞室断面型式的优化问题,但是隧道及地下工程的开挖过程不完全是静力学稳定问题,而是地质学、工程学和稳态平衡等问题的动态综合,是十分复杂的物理力学过程[96]

从事故统计结果来看,一方面需要研究Ⅴ级围岩内开挖所述跨度的隧洞在力学性能上是否已经超过了该围岩本身所能允许的最大隧洞跨度,也需要研究不同围岩质量等级下,如果岩体是均匀的,开挖多大跨度、何种型式断面的洞室才能满足充分发挥岩体自承载能力;另一方面,如果确实无法避免需要在Ⅴ级围岩内开挖超过其允许跨度的洞室,目前所采用的强支护型式,将岩体的变形作用于支护上,靠坚固的支护来抵抗和控制围岩的变形,对于埋深浅的岩体或者土体可以适用,但是对于更大埋深的岩体洞室,意图靠强支护来承受上部岩体的压力并不现实,归根结底还是要寻求某种更合理的支护方式发挥围岩自身的承载能力。

2.2 非一致环向压缩变形

表 5可以看出,从塌方区的地质情况来讲,洞室穿过断层破碎带或有地下水作用是造成塌方的最主要原因。

由于断层破碎带内的岩体本身存在矿物充填、夹层、张拉扭曲、裂缝等,使其丧失均匀性、连续性、完整性,只要当洞室开挖穿过断层破碎带时,必然会在横断面上出现岩体质量分布不均匀的情况,极易导致非一致环向压缩变形。此时,如果在全断面布置均匀统一的支护方式,而断面上岩体之间的相对质量等级并没有变化,仍会继续产生非一致环向压缩变形。

另一方面,地下水的作用机理是由于岩体中存在裂隙等渗漏通道,水的渗透会导致有些夹层中的填充物遇水软化,更加降低了岩体的均匀性、完整性,也使得断面的不均匀性进一步加剧,从而导致事故的发生。

综上所述,要想满足断面形成一致的环向压缩变形,从根本上来讲,是要提高断面上质量较差的岩体的相对质量级别,将其补强到与周围岩体质量相当,使整个断面岩体质量均匀化;另一方面,对于地下水的渗漏通道,单纯的封堵渗漏通道只能是暂时阻止地下水通过,如果岩体的强度不能得到有效加强,非一致环向压缩变形仍然会继续发生,渗透通道又会被重新张拉开。因此,岩体渗漏封堵的根本还是围岩补强。

2.3 支护时机

表 6可以看出,发生在掌子面10 m以内的塌方占44%,发生在初期支护与二次衬砌阶段(通常为掌子面10 m之后)的塌方占48%,总数占到了塌方数的92%。为了体现不同断面掌子面附近的三维效应,用塌方位置距掌子面距离与洞室跨度之比进行衡量,如表 8所示。

表 8 跨度比与事故数统计表
跨度比 事故数 占比/%
≤1.0 21 42
1.0~2.0 4 8
2.0~3.0 4 8
3.0~4.0 7 14
4.0~5.0 5 10
≥5.0 9 18

掌子面附近发生塌方,一是可以理解为不论采取钻爆法还是TBM等技术施工,开挖瞬间破坏了岩体的初始平衡状态,新揭露围岩的表面岩体由三轴受力状态变为两轴受力状态的临空面,围岩变形过大导致塌方;二是可归结为对掌子面前方的地质情况估计不足,对可能出现的断层破碎带及渗漏通道等没有做好足够的预测预警,未提出预案并采取有效的预防措施避免开挖后掌子面发生塌方。

在初期支护与二次衬砌阶段发生塌方,一方面仍可归结为支护措施本身没有从岩体的角度出发考虑补强破碎部位,使整个断面形成一致环向压缩变形,进而影响围岩的长期稳定性;另一方面,支护时机的选择是否合理也值得探讨。某大型地下储库爆破开挖每个循环进尺3 m,每天2个循环,5月14日洞室开挖通过典型监测断面,据多点位移计监测数据表明,监测断面位移在掌子面未开挖之前2天内已经开始启动,位移最大变化发生在掌子面经过监测断面的4天之内,然后趋于平稳,如图 3所示。可以看出,洞室开挖过程中,约占90%的位移发生在掌子面前(未开挖)10 m和掌子面后(已开挖)20 m范围内,此时荷载大量转移完成。因此,最佳的支护时机应该是选择在荷载转移的中前期。

图 3 (网络版彩图)典型断面多点位移计监测数据

2.4 掌子面前方岩体预测

表 7可以看出,同一座地下工程中发生2次及2次以上塌方事故的案例占到了事故总数的44%,接近总数的一半。

在同一工程中多次发生塌方事故,而且占比如此之高,说明人们对掌子面之前岩体预测的手段和设备还不够完善,没有及时采取防控措施。

3 应对策略

针对以上问题,可采取以下对策。

3.1 最优断面计算及预注浆

计算分析地下洞室围岩在不同岩体质量等级、不同埋深等情况下,能够充分发挥围岩自身承载能力的最优洞室断面型式及最佳洞径。

项目的规划设计中,要尽量避免使洞室穿过Ⅴ级或更差岩体。如确实难以避免,采取提前强化软弱围岩的方法提高围岩强度,然后再进行开挖。对于埋深较浅的洞室,可以在地面上向下方的软弱岩体区域进行注浆,使洞室周边软弱破碎岩体形成整体后再进行开挖,开挖后立即施以全断面柔性支护;对于埋深较深的洞室,需要在开挖面前方将要遇到软弱破碎岩体时,提前进行预注浆,预注浆孔要呈放射状布置,待浆液建立起强度并将软弱破碎岩体凝结成整体后再进行开挖,开挖后立即注浆加固并施以全断面柔性支护。

3.2 局部补强形成一致环向压缩变形

当开挖过程中遇到断层破碎带穿过洞室断面,利用预注浆加固掌子面前方岩体,开挖后立即采用后注浆的方法对破碎带岩体进行补强。

为了能够保证尽快使受力圈封闭且不影响下一循环施工,注浆材料需要在短时间内建立足够强度,必要时可采用特种水泥等材料;注浆设备要小巧灵活,操作方便,有利于快速施工;补强注浆孔应集中布置在破碎带部位,避免在岩体质量好的部位冗余布孔,孔深不宜过深,以覆盖洞壁内应力峰值所在深度为宜。

如遇到裂隙水发育的情况,本质上还是需要采取破碎带补强,兼顾渗漏封堵,但操作方法上略有不同。首先布孔方式上需要以出水点为中心向四周进行布孔,孔深应比补强注浆孔略深以覆盖围岩松动圈内的渗漏通道为宜;其次注浆时需要从远离出水点的注浆孔逐渐向出水中心分序注浆。

不论单纯补强注浆还是补强兼顾渗漏封堵注浆,每个孔在进行注浆时都应让其周围注浆孔保持畅通,这样有利于排出裂隙水并使浆液在岩体裂隙中贯通。

3.3 选择黄金支护时段

图 3可以看出,洞室开挖过程中,约占90%的位移发生在掌子面前(未开挖)10 m和掌子面后(已开挖)20 m范围内,此时荷载会形成大量转移,由表 68可看出,贴近掌子面及1倍等效洞径内的区段是事故高发段;如果在此时段之后再进行支护,本质上相当于在已经接近新平衡状态的围岩上又增加了一次扰动,增加围岩的负担,极易诱发事故。所以也正如事故统计所显示,从塌方实际距离看,90%以上的事故发生在掌子面到初期支护或二次衬砌之间;从跨度比来看,82%的事故发生在跨度比为5.0范围内。

由于掌子面前10 m至后20 m是荷载转移的主要区间,所以最佳支护时机应该选择在此区间的中前期,即掌子面前10 m至掌子面后10 m是采取支护措施的黄金时段。故开挖面前方如果会遇到断层破碎带,应在提前10 m的范围内采取预注浆措施,对前方围岩做好加固处理,再进行开挖;开挖后的支护应保证在距离掌子面10 m之内完成,这样才能充分发挥支护的作用,避免发生过大的围岩非一致环向压缩变形,这同时也给支护施工手段提出了更高的要求,要在短时间内快速高质完成支护,需要从材料、设备、工艺等方面对现有技术进行改进。

3.4 风险预测及评估

对项目区及开挖面前方可能出现的风险进行预测评估并做出相应的预案可进一步化解事故的发生。虽然现有的监测手段有很多,如微震监测系统、探地雷达、声波探测等,但是风险预测评估是一个集海量数据采集、数据融合加工、知识管理决策、信息实时互动等于一体的综合性、前沿性的工作,需要建立统一的平台,能够从多类型信息采集、数据融合加工、风险决策等方面入手,做到风险快速识别及评估,并能够针对不同的风险类型提出对应的决策及预案。这样可使施工过程中风险早发现、早决策、早治理,进一步保证地下工程的安全。

4 结论

本文在统计中国新奥法施工事故案例的基础上,总结了人们对新奥法存在的认识偏差,并提出相应的应对策略,得出以下主要结论:

1) Ⅴ级岩体内不适于开挖铁路公路或更大跨度的洞室,采用强支护也难以避免发生事故的高风险率,项目选址时应尽量避开该类岩体;如确实无法避开,应通过预注浆的方式将岩体强化后再开挖,开挖后应立即施以全断面柔性支护。

2) 洞室穿过断层破碎带,断面上岩体质量分布不均是导致非一致环向压缩变形的根本原因。此时在全断面采用强支护的方式并不能有效改善非一致环向压缩变形,需要在破碎带上进行钻孔注浆,单独补强,使其可以与周围岩体形成一致环向压缩变形。

3) 对于有裂隙水存在的渗漏通道,单纯的封堵只能是暂时的,必须通过补强破碎岩体,避免非一致环向压缩变形才能防止渗漏通道重新张拉开。补强注浆时需要在出水点中心附近钻孔,并由外到内分序注浆。

4) 如果支护滞后,不仅难以取得支护效果,反而会在新形成平衡状态的围岩上增加新的扰动,增加围岩负担,极易诱发事故。支护的黄金时段应该是掌子面前10 m至掌子面后10 m,或前后跨度比为3.0范围内,掌子面前方应做好预注浆,对岩体强化后再进行开挖,掌子面后方应快速做好后注浆,充分发挥支护的作用。

5) 做好风险预测评估及应对预案能有效提高风险防范意识,降低事故的发生率,需要建立一个统一的平台,从多类型信息采集、数据实时分析等方面入手,做到风险快速识别及评估,并能够针对不同的风险类型提出对应的决策及预案,进一步保证地下工程的安全。

隧道及地下工程开挖是十分复杂的物理力学过程,其开挖方式、断面类型、岩体条件、地应力环境、地下水情况等等都是影响洞室后期稳定及安全的重要因素,本文统计分析了部分造成塌方事故的原因,而地应力场、爆破振动等对洞室可能产生潜在影响的因素本文暂未作统计。

参考文献
[1]
国家安全生产应急救援指挥中心.国家安全生产应急救援指挥中心关于近期隧道施工事故及救援情况的通报[EB/OL].[2017-10-27]. http://www.emc.gov.cn/Contents/Channel_5993/2017/1026/297345/content_297345.html.
National Administation for Work Safety Emergency Response. National administration for work safety emergency response on the recent tunnel construction accident and rescue report[EB/OL].[2017-10-27]. http://www.emc.gov.cn/Contents/Channel_5993/2017/1026/297345/content_297345.html. (in Chinese)
[2]
赵勇, 田四明. 中国铁路隧道数据统计[J]. 隧道建设, 2017, 37(5): 641-642.
ZHAO Y, TIAN S M. China railway tunnel data statistics[J]. Tunnel Construction, 2017, 37(5): 641-642. (in Chinese)
[3]
蒋树屏. 中国公路隧道数据统计[J]. 隧道建设, 2017, 37(5): 643-644.
JIANG S P. China railway tunnel data statistics[J]. Tunnel Construction, 2017, 37(5): 643-644. (in Chinese)
[4]
陈益民, 周垂一. 中国水利水电地下工程数据统计(截至2016年底)[J]. 隧道建设, 37(6): 778-779.
CHEN Y M, ZHOU C Y. China's water conservancy and hydropower underground engineering data statistics (End of 2016)[J]. Tunnel Construction, 37(6): 778-779. (in Chinese)
[5]
丁国生, 李春, 王皆明, 等. 中国地下储气库现状及技术发展方向[J]. 天然气工业, 2015, 35(11): 107-112.
DING G S, LI C, WANG K M, et al. The status quo and technical development direction of underground gas storages in China[J]. Natural Gas Industry, 2015, 35(11): 107-112. DOI:10.3787/j.issn.1000-0976.2015.11.017 (in Chinese)
[6]
袁光杰, 夏焱, 金根泰, 等. 国内外地下储库现状及工程技术发展趋势[J]. 石油钻探技术, 2017, 45(4): 8-14.
YUAN G J, XIA Y, JIN G T, et al. Present state of underground storage and development trends in engineering technologies at home and abroad[J]. Petroleum Drilling Techniques, 2017, 45(4): 8-14. (in Chinese)
[7]
韩瑞庚. 地下工程新奥法[M]. 北京: 科学出版社, 1987.
HAN R G. New Austrian tunneling method[M]. Beijing: Science Press, 1987. (in Chinese)
[8]
RABCEWICZ L. The new Austrian tunnelling method[J]. Water Power, 1964, 19-24.
[9]
RABCEWICZ L, GOLSER J. Principles of dimensioning the support system for the "new Austrian tunnelling method"[J]. Water Power, 1973, 88-93.
[10]
涂光钧, 段继华. 新奥法及在我国采用新奥法的建议[J]. 铁道建筑, 1980, 10: 6-8.
TU G J, DUAN J H. New Austrian method and the suggestion of using new Austrian method in China[J]. Railway Construction, 1980, 10: 6-8. (in Chinese)
[11]
下坑隧道应用新奥法记实[J].铁道标准设计, 1981, (6): 2-2.
New Austrian tunneling method is used to record the actual[J]. Railway Standard Design, 1981, (6): 2-2. (in Chinese) http://www.cnki.com.cn/Article/CJFDTotal-TDBS198106000.htm
[12]
赵运臣. 浅谈新奥法在我国城市地铁设计与施工中的应用[J]. 隧道建设, 2004, 1: 9-10, 14.
ZHAO Y C. Talking about the application of new Austrian tunneling method in the design and construction of urban subway in China[J]. Tunnel Construction, 2004, 1: 9-10, 14. (in Chinese)
[13]
甘小江. 隧道贯通段塌方处理施工技术[J]. 现代隧道技术, 2013, 49(6): 168-171.
GAN X J. Construction technique for treating a collapse at the tunnel breakthrough[J]. Modern Tunnelling Technology, 2013, 49(6): 168-171. (in Chinese)
[14]
谭彩云. 大岭铺隧道坍方处理[J]. 铁道建筑技术, 2000, 3: 46-48.
TAN C Y. Collapse treatment of Dalingpu tunnel[J]. Railway Construction Technology, 2000, 3: 46-48. (in Chinese)
[15]
陈昌勇. 侯家湾四号隧道大坍方的处理[J]. 现代隧道技术, 2000(3): 43-46.
CHEN C Y. Treatment for collapse at No.4 tunnel of Houjiawan[J]. Modern Tunnelling Technology, 2000(3): 43-46. (in Chinese)
[16]
魏武宁. 漳泉铁路岩顶隧道施工地质病害的处理[J]. 铁道建筑, 2005(7): 57-59.
WEI W N. Treatment of geological diseases in rock roof tunnel construction of Zhangquan railway[J]. Railway Construction, 2005(7): 57-59. DOI:10.3969/j.issn.1003-1995.2005.07.023 (in Chinese)
[17]
洪波. 岩顶隧道出口不良地质段的施工[J]. 铁道建筑技术, 1997, 4: 34-36.
HONG B. Construction of bad geological section at rock top tunnel exit[J]. Railway Construction Technology, 1997, 4: 34-36. (in Chinese)
[18]
崔韫鑫.高速公路隧道安全施工关键技术研究[D].天津: 河北工业大学, 2014.
CUI Y X. Key technology of highway tunnel construction safety[D]. Tianjin: Hebei University of Technology, 2014. (in Chinese) http://cdmd.cnki.com.cn/Article/CDMD-10080-1015031338.htm
[19]
魏家君, 王俊生. 田坝子隧道的坍方处理[J]. 现代隧道技术, 2000(3): 47-49.
WEI J J, WANG J S. Treatment for Tianbazi tunnel collapse[J]. Modern Tunnelling Technology, 2000(3): 47-49. (in Chinese)
[20]
杜能胜. 山岭铁路单线隧道坍方处理技术[J]. 工程科技, 2000(3): 23-28.
DU N S. Collapse treatment technology of mountain railway single-track tunnel[J]. Engineering Science and Technology, 2000(3): 23-28. DOI:10.3969/j.issn.2095-0977.2000.03.006 (in Chinese)
[21]
高扬, 谭成中, 郝文洲. 铁路富水软弱围岩隧道的设计与施工——南昆线草庵隧道不良地质地段病害整治[J]. 现代隧道技术, 1998, 2: 32-38.
GAO Y, TAN C Z, HAO W Z. Design and construction of the railway tunnel in water-abudant soft surrounding rock:Contermeasures against unfavorable geological condition of Caoan tunnel on Nankun railway[J]. Modern Tunnelling Technology, 1998, 2: 32-38. (in Chinese)
[22]
朱伟, 郝文洲. 全封闭深孔预注双浆固结围岩技术在草庵隧道中的应用[J]. 山西建筑, 2000(1): 53-56.
ZHU W, HAO W Z. Application of fully enclosed deep hole pre-injection double slurry consolidation surrounding rock technology in Caoan tunnel[J]. Shanxi Architecture, 2000(1): 53-56. (in Chinese)
[23]
宋伦杰. 南昆线草庵隧道大涌水和坍方地段注浆技术[J]. 现代隧道技术, 1999(2): 52-56.
SONG L J. Grouting technology for treatment of serious gushing water and collapse section in Caoan tunnel on Nanning-Kunming railway line[J]. Modern Tunnelling Technology, 1999(2): 52-56. (in Chinese)
[24]
周德培.高烈度地震区隧道洞口段抗震性能的试验研究[C]//面向21世纪的岩石力学与工程: 中国岩石力学与工程学会第四次学术大会论文集, 1996: 236-242.
ZHOU D P. The model test studies for the portal part of the tunnel in high earthquake intensity zone[C]//Rock Mechanics and Engineering for the Twenty-first Century: A Collection of the 4th Academic Conference of the Chinese Institute of Rock Mechanics and Engineering, 1996: 236-242. (in Chinese) http://cpfd.cnki.com.cn/Article/CPFDTOTAL-ZGYJ199605001032.htm
[25]
陈江. 黄土隧道施工中坍方的预防与处理[J]. 铁道建设, 1997(3): 15-18.
CHEN J. Prevention and treatment of collapse in loess tunnel construction[J]. Railway Construction, 1997(3): 15-18. (in Chinese)
[26]
蒋正才. 刺桐关三号隧道通过断层坍落体的施工技术[J]. 隧道及地下工程, 1995, 16(4): 26-34.
JIANG Z C. Construction technology of No.3 tunnel through fault slump falling body[J]. Tunnel and Underground Engineering, 1995, 16(4): 26-34. (in Chinese)
[27]
宋彩屏. 殿沟隧道进口大塌方的整治[J]. 铁道建筑技术, 1998, 3: 49-50.
SONG C P. The temple ditch tunnel import landslide remediation[J]. Railway Construction Technolog, 1998, 3: 49-50. (in Chinese)
[28]
马永红. 赵家2#隧道衬砌裂损原因及整治措施[J]. 铁道建筑, 2001(4): 36-38.
MA Y H. Reasons for crack and damage of lining of Zhao Jia 2# tunnel and remedial measures[J]. Railway Construction, 2001(4): 36-38. DOI:10.3969/j.issn.1003-1995.2001.04.014 (in Chinese)
[29]
卜庆宝. 用"眼镜法"修建大跨度隧道洞室的探讨[J]. 铁道工程学报, 1993(3): 96-101.
BU Q B. Discussion on the construction of large-span tunnel caverns by "glasses method"[J]. Journal of Railway Engineering Society, 1993(3): 96-101. (in Chinese)
[30]
赵福. 大秦线西坪隧道采用"新奥法"处理坍方体的尝试——兼谈"眼镜法"[J]. 石家庄铁道大学学报(自然科学版), 1986(4): 54-56.
ZHAO F. The attempt of using new Austrian method to deal with the collapse of Xiping tunnel on Daqin line-Also on glasses method[J]. Journal of Shijiazhuang Railway University (Natural Science), 1986(4): 54-56. (in Chinese)
[31]
史玉新, 张金富.西坪隧道的岩土工程[C]//全国第三次工程地质大会.成都: 中国地质学会, 1988: 644-652.
SHI Y X, ZHANG J F. Geotechnical engineering of Xiping tunnel[C]//The 3rd national engineering geological Congress. Chengdu: Geological Society of China, 1988: 644-652. (in Chinese) http://cpfd.cnki.com.cn/Article/CPFDTOTAL-GCDZ198812001107.htm
[32]
冯卫星, 徐明新. 铁路隧道新奥法施工新实践[J]. 岩石力学与工程学报, 2001, 20(4): 524-524.
FENG W X, XU M X. New practice of NATM in railway tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering, 2001, 20(4): 524-524. DOI:10.3321/j.issn:1000-6915.2001.04.020 (in Chinese)
[33]
韩成圈. 迈式锚杆在东风隧道初期支护和超前预支护中的应用[J]. 河北建筑工程学院学报, 1999(3): 64-70.
HAN C Q. The application of earlier trimbering and super trimbering of MI-roofbolt in Dong Feng tunnel[J]. Journal of Hebei Institute of Architectural Engineering, 1999(3): 64-70. (in Chinese)
[34]
徐明新, 冯卫星. 新技术新方法在东风隧道施工中的应用[J]. 石家庄铁道学院学报, 2000, 13(B09): 12-14.
XU M X, FENG W X. Application of new technology and new method in Dongfeng tunnel construction[J]. Journal of Shijiazhuang Railway Institute, 2000, 13(B09): 12-14. (in Chinese)
[35]
雷双龙. 新奥法原理在东风隧道施工中的规范化应用[J]. 山西水利, 2000(3): 27-29.
LEI S L. Application of NATM principle in construction of Dongfeng tunnel[J]. Shanxi Water Conservancy, 2000(3): 27-29. (in Chinese)
[36]
陈志强, 岳华. 老营盘隧道病害整治技术[J]. 铁道建筑, 2011(11): 51-53.
CHEN Z Q, YUE H. Old Yingpan tunnel disease control technology[J]. Railway Construction, 2011(11): 51-53. (in Chinese)
[37]
樊建平. 山西省寺铺尖隧道岩爆问题初探[J]. 河北地质学院学报, 1996, 19(2): 154-156.
FAN J P. A preliminary discussion on the rockburst problem of Sipujian tunnel[J]. Journal of Hebei GEO University, 1996, 19(2): 154-156. (in Chinese)
[38]
黄成光, 于敦荣. 公路隧道施工[M]. 北京: 人民交通出版社, 2001.
HUANG C G, YU D R. Highway tunnel construction[M]. Beijing: People's Traffic Press, 2001. (in Chinese)
[39]
谷明成, 何发亮, 陈成宗. 秦岭隧道岩爆的研究[J]. 岩石力学与工程学报, 2002, 21(9): 1324-1329.
GU M C, HE F L, CHEN C Z. Study on rockburst in Qinling tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(9): 1324-1329. DOI:10.3321/j.issn:1000-6915.2002.09.009 (in Chinese)
[40]
李春杰, 李洪奇. 秦岭隧道岩爆特征与施工处理[J]. 现代隧道技术, 1999(1): 36-41.
LI C J, LI H Q. Rock burst characteristics and treatment methods in Qinling tunnel[J]. Modern Tunnelling Technology, 1999(1): 36-41. (in Chinese)
[41]
司军平. 对秦岭隧道Ⅱ线平导进口端岩爆的几点认识[J]. 现代隧道技术, 1998(2): 57-60.
SI J P. Some understandings on rockburst at the entrance of horizontal guide of Qinling tunnel line Ⅱ[J]. World Tunnel, 1998(2): 57-60. (in Chinese)
[42]
张杰, 张可诚. 秦岭隧道掘进机通过坍方地段的对策[J]. 现代隧道技术, 1999(3): 14-18.
ZHANG J, ZHANG K C. Countermeasure against collapse during driving with TBM in Qinling tunnel[J]. Modern Tunnelling Technology, 1999(3): 14-18. (in Chinese)
[43]
崔凌云, 伊晓明.兰渝铁路桃树坪隧道发生流沙坍塌事故[N].兰州日报, 2012-12-13.
CUI L Y, YI X M. Quicksand collapse of Taoshuping tunnel in Lanzhou-Chongqing railway[N]. Lanzhou Daily, 2012-12-13. (in Chinese)
[44]
陈树青, 王飞.桃树坪隧道攻克世界级难题[N].中国铁道建筑报, 2014-06-12.
CHEN S Q, WANG F. Peach Ping tunnel conquers world-class problems[N]. China Railway Construction News, 2014-06-12. (in Chinese)
[45]
富杰彬. 小盘岭1号隧道出口塌方事故处理[J]. 辽宁省交通高等专科学校学报, 2015, 17(3): 15-17.
FU J B. The Xiaopanling No.1 exit tunnel collapse accident treatment[J]. Journal of Liaoning Provincial College of Communications, 2015, 17(3): 15-17. DOI:10.3969/j.issn.1008-3812.2015.03.005 (in Chinese)
[46]
金宝森. "专家科学决策起到了关键作用"——吉珲高铁(客运专线)小盘岭隧道塌方成功抢险记事[J]. 吉林劳动保护, 2014(4): 7-8.
JIN B S. "Expert scientific decision-making played a key role":Jinlin-Hunchun high-speed railway (passenger dedicated line) Xiaopanling tunnel collapse success emergency notes[J]. Jilin Labor Protection, 2014(4): 7-8. (in Chinese)
[47]
张学明.兰新线第二双线小平羌隧道发生坍塌事故[N].甘肃日报, 2011-04-21.
ZHANG X M. Collapse accident of the second double-track Xiaoping Qiang tunnel of Lanxin railway[N]. Gansu Daily, 2011-04-21. (in Chinese)
[48]
李佳颖, 姜玉勇.兰新铁路第二双线小平羌隧道"4·20"重大事故调查组成立[N].张掖日报, 2011-04-27.
LI J Y, JIANG Y Y. Investigation team of "4·20" major accidents of the second double-track Xiaoping Qiang tunnel of Lanxin railway was established[N]. Zhangye Daily, 2011-04-27. (in Chinese)
[49]
杨伟玲.小平羌隧道"4·20"重大事故追踪[EB/OL].[2012-05-12].http://xbsb.gansudaily.com.cn/system/2012/05/12/012480135.shtml.
YANG W L. "4·20" major accident tracking of Xiaoping Qiang tunnel[EB/OL].[2012-05-12].http://xbsb.gansudaily.com.cn/system/2012/05/12/012480135.shtml. (in Chinese)
[50]
覃海明.那适2号隧道再次发生塌方[N].南宁日报, 2010-07-15.
QIN H M. The appropriate 2 tunnel collapse again[N], Nanning Daily, 2010-07-15. (in Chinese)
[51]
梁学成, 冉鹏. 包西铁路某双线隧道塌方处理施工[J]. 水利水电施工, 2010(4): 38-41.
LIANG X C, RAN P. Collapse treatment construction of a two-lane tunnel on Baoxi railway[J]. Water Conservancy and Hydropower Construction, 2010(4): 38-41. (in Chinese)
[52]
卢通.云南临沧大临铁路红豆山隧道斜井发生事故致6人死亡[N].新京报网, 2017-06-21.
LU T. 6 people died in an accident at the inclined shaft of Honggongshan tunnel of Lincang-Dalin railway in Yunnan[N]. Beijing News Network, 2017-06-21. (in Chinese)
[53]
赵前进. 玉磨铁路隧道工程地质特征及地质风险分析[J]. 铁道勘察, 2017(4): 42-45.
ZHAO Q J. Geological characteristics and geological risk analysis of Yumo railway tunnel[J]. Railway Investigation and Surveying, 2017(4): 42-45. DOI:10.3969/j.issn.1672-7479.2017.04.013 (in Chinese)
[54]
赵晓彬, 陈林术, 胡建, 等. 慈母山1号隧道塌方原因与处理方案分析[J]. 公路交通技术, 2010(3): 112-115.
ZHAO X B, CHEN L S, HU J, et al. Analysis of causes and disposal plan for landslide of No.1 tunnel in Cimu mountain[J]. Technology of Highway and Transport, 2010(3): 112-115. DOI:10.3969/j.issn.1009-6477.2010.03.031 (in Chinese)
[55]
张自强. 慈母山1号隧道B标段塌方技术处理[J]. 内蒙古科技与经济, 2012(1): 118-119.
ZHANG Z Q. Landslide treatment of section B of Cimushan No.1 tunne[J]. Inner Mongolia Science Technology and Economy, 2012(1): 118-119. DOI:10.3969/j.issn.1007-6921.2012.01.061 (in Chinese)
[56]
王京春, 田珣, 陈平. 沙赫里斯坦隧道塌方处理技术[J]. 中外公路, 2010, 30(3): 215-217.
WANG J C, TIAN X, CHEN P. Landslide treatment technology of Shahristan tunnel[J]. Chinese and Foreign Highway, 2010, 30(3): 215-217. (in Chinese)
[57]
邓雄业, 李明高. 靠椅山隧道大塌方的处理[J]. 西部探矿工程, 2000, 12(4): 91-93.
DENG X Y, LI M G. The treatment of collapse in the tunnel[J]. Prospecting Project in Western China, 2000, 12(4): 91-93. (in Chinese)
[58]
吴明显. 缙云山隧道的坍方处理[J]. 公路, 1994(9): 32-36.
WU M X. Collapse treatment of Jinyun mountain tunnel[J]. Highway, 1994(9): 32-36. (in Chinese)
[59]
印建文. 浅析隧道坍方的处理技术[J]. 西部探矿工程, 2002(S1): 218-219.
YIN J W. Analysis of tunnel collapse treatment technology[J]. Western Prospecting Engineering, 2002(S1): 218-219. (in Chinese)
[60]
徐坤甲, 李永丰. 青岭隧道采用长大管棚法处理断层破碎带坍方[J]. 现代隧道技术, 2000(1): 8-13.
XU K J, LI Y F. Large pipe forepoling technique for collapse treatment at fault fractured zone in Qingling tunnel[J]. Modern Tunnelling Technology, 2000(1): 8-13. (in Chinese)
[61]
冯卫星, 建军. 隧道坍方案例分析[M]. 成都: 西南交通大学出版社, 2002.
FENG W X, JIAN J. Case analysis of tunnel collapse[M]. Chengdu: Southwest Jiatong University Press, 2002. (in Chinese)
[62]
蒋月海. 白花山右线隧道大塌方事故处理[J]. 公路交通技术, 2004(5): 122-126.
JIANG Y H. Treatment of Baihuashan right line tunnel collapse[J]. Technocogy of Highway and Transport, 2004(5): 122-126. DOI:10.3969/j.issn.1009-6477.2004.05.037 (in Chinese)
[63]
张金彦. 蒿庄梁隧道滑坡体浅埋段进洞施工方案[J]. 西部探矿工程, 1999, 11(6): 43-46.
ZANG J Y. Construction scheme for shallow buried section of landslide body in Haozhuangliang tunnel[J]. Prospecting Project in Western China, 1999, 11(6): 43-46. (in Chinese)
[64]
金文良. 黄土岭隧道病害成因分析及处治设计[J]. 公路隧道, 2011(1): 32-36.
JIN W L. Cause analysis and treatment design of diseases in Huangtuling tunnel[J]. Highway Tunnel, 2011(1): 32-36. (in Chinese)
[65]
饶军应, 傅鹤林, 黎明, 等. 白山隧道塌方处治技术及其监测结果分析[J]. 现代隧道技术, 2014, 51(2): 157-166.
RAO J Y, FU H L, LI M, et al. Treatment techniques for and monitoring result analysis of the Baishan tunnel collapse[J]. Modern Tunnelling Technology, 2014, 51(2): 157-166. DOI:10.3969/j.issn.1009-6582.2014.02.026 (in Chinese)
[66]
何琴, 王方, 谢文利. 超前支护在处理父子关隧道塌方中的应用[J]. 岩土工程界, 2007, 10(4): 47-49.
HE Q, WANG F, XIE W L. Application of advanced support in dealing with collapse of Father-Son-Guan tunnel[J]. Geotechnical Engineering, 2007, 10(4): 47-49. DOI:10.3969/j.issn.1674-7801.2007.04.013 (in Chinese)
[67]
刘旭.乌竹岭隧道塌方事故原因分析和处治方法研究[D].长春: 吉林大学, 2008.
LIU X. A study on treatment and collapse mechanism analysis of speedway tunnel in Wuzhuling[D]. Changchun: Jiling University, 2008. (in Chinese) http://cdmd.cnki.com.cn/Article/CDMD-10183-2008060068.htm
[68]
张春林. 乌竹岭隧道塌方处理方案[J]. 公路交通技术, 2008(5): 109-112.
ZHANG C L. Treatment schemes for landslide in Wuzhuling tunnel[J]. Technology fo Highway and Transport, 2008(5): 109-112. DOI:10.3969/j.issn.1009-6477.2008.05.032 (in Chinese)
[69]
王迎超, 尚岳全, 靖洪文, 等. 隧道塌方段施工方案优化及效果评价[J]. 岩土力学, 2011(S2): 514-520.
WANG Y C, SHANG Y Q, JING H W, et al. Construction scheme optimization and effect evaluation of tunnel collapse section[J]. Geotechnical Mechanics, 2011(S2): 514-520. (in Chinese)
[70]
腾华, 刘艳红, 王世杰. 高阳寨隧道八十小时大营救——湖北消防官兵宜万铁路特大坍塌事故救援纪实[J]. 中国消防, 2007, 22: 14-15.
TENG H, LIU Y H, WANG S J. Gaoyangzhai tunnel eighty hours rescue:Hubei fire officers and soldiers Yiwan railway collapse rescue documentary[J]. China Fire, 2007, 22: 14-15. (in Chinese)
[71]
大唐. 生命在岩崩下殒灭——宜万铁路巴东段高阳寨隧道"11·20"岩崩事故追踪[J]. 湖南安全与防灾, 2008(1): 41-43.
DA T. The death of life under the rock avalanche:The "11·20" rockfall accident of the Gaoyangzhai tunnel in the eastern section of Yiwan railway[J]. Hunan Security and Disaster Prevention, 2008(1): 41-43. (in Chinese)
[72]
中国路桥网.中交一公局荣乌高速河北营尔岭隧道塌方9人被困[EB/OL].[2017-10-01]. http://news.9to.com/show.php/itemid-51569/.
China road and bridge network. Nine people were trapped in a landslide at Yingerling tunnel, Hebei Province[EB/OL].[2017-10-01]. http://news.9to.com/show.php/itemid-51569/. (in Chinese)
[73]
高峰, 唐星, 李星, 等. 基于UDEC离散元法的隧道塌方特征分析[J]. 重庆交通大学学报(自然科学版), 2018, 37(1): 24-28.
GAO F, TANG X, LI X, et al. Tunnel collapse characteristics analysis based on UDEC discrete element method[J]. Journal of Chongqing Jiaotong University (Natural Science), 2018, 37(1): 24-28. DOI:10.3969/j.issn.1674-0696.2018.01.04 (in Chinese)
[74]
罗定, 杨宇. 崇遵高速公路凉风垭隧道塌方治理[J]. 工程设计与建设, 2005, 37(4): 37-41.
LUO D, YANG Y. Landslide treatment of Liangfengya tunnel on Chongzun expressway[J]. Engineering Design and Construction, 2005, 37(4): 37-41. DOI:10.3969/j.issn.1673-8993.2005.04.010 (in Chinese)
[75]
刘从明. 崇遵高速公路凉风垭隧道严重变形分析[J]. 现代隧道技术, 2004, 41(2): 58-62.
LIU C M. Analysis of severe deformation of Liangfengya tunnel on Chongzun expressway[J]. Modern Tunnel Technology, 2004, 41(2): 58-62. DOI:10.3969/j.issn.1009-6582.2004.02.011 (in Chinese)
[76]
唐国军, 林增海, 陈梅. 隆田隧道大型塌方处治技术[J]. 西部交通科技, 2012(8): 76-79.
TANG G J, LIN Z H, CHEN M. Large landslide treatment technology of Longtian tunnel[J]. Traffic Science and Technology in Western China, 2012(8): 76-79. DOI:10.3969/j.issn.1673-4874.2012.08.027 (in Chinese)
[77]
南康, 贾瑞华, 赵文祥. 丁家湾隧道塌方原因分析及处理技术研究[J]. 中外公路, 2007, 27(5): 93-96.
NAN K, JIA R H, ZHAO W X. Cause analysis and treatment technology research of Dingjiawan tunnel collapse[J]. Chinese and Foreign Highway, 2007, 27(5): 93-96. DOI:10.3969/j.issn.1671-2579.2007.05.030 (in Chinese)
[78]
徐春明, 许波, 戴夏斌, 等. 从后云台山隧道地质特征探讨841隧道整治工程勘察方案[J]. 西南公路, 2017, 3: 25-28.
XU C M, XU B, DAI X B, et al. Investigation scheme of 841 tunnel regulation project from geological characteristics of Houyuntaishan tunnel[J]. Southwest Highway, 2017, 3: 25-28. (in Chinese)
[79]
房栓社. 浅谈浆喷桩在三亚绕城高速公路工程软基处理中的应用[J]. 科技创新导报, 2010(1): 115-115.
FANG S S. Discussion on the application of slurry injection pile in soft foundation treatment of sanya bypass expressway project[J]. Science and Technology Innovation Guide, 2010(1): 115-115. DOI:10.3969/j.issn.1674-098X.2010.01.092 (in Chinese)
[80]
董亚岭.想了解三亚绕城高速隧道塌方事故吗[EB/OL].[2013-08-29]. http://lizu.baike.com/article-1276073.html.
DONG Y L. Want to know Sanya around the city high-speed tunnel collapse accident[EB/OL].[2013-08-29]. http://lizu.baike.com/article-1276073.html. (in Chinese)
[81]
何世荣. 浅谈新奥法在静宁隧道施工中的应用[J]. 甘肃科技纵横, 2008, 4: 129-129, 6.
HE S R. On the application of new Austrian tunneling method in Jingning tunnel construction[J]. Gansu Science and Technology, 2008, 4: 129-129, 6. (in Chinese)
[82]
李剑平, 徐恕. 静宁隧道黄土层富水段施工技术与工艺[J]. 公路交通科技(学术版), 2010, 27(12): 245-248.
LI J P, XU S. Construction technology and technology of water-rich section of loess layer of Jingning tunnel[J]. Highway Traffic Science and Technology (Academic Edition), 2010, 27(12): 245-248. (in Chinese)
[83]
吴耀权. 富尔江引水隧洞的地质灾害及防治对策[J]. 西部探矿工程, 1996, 8(3): 27-29.
WU Y Q. Geological disasters and preventive measures of Fuer river diversion tunnel[J]. Prospecting Project in Western China, 1996, 8(3): 27-29. (in Chinese)
[84]
王立川, 熊朝东. 小浪底水利枢纽工程2#导流洞坍方处理总结[J]. 隧道建设, 1997(3): 21-29.
WANG L C, XIONG C D. Summary of collapse treatment of 2# diversion tunnel of Xiaolangdi water control project[J]. Tunnel Construction, 1997(3): 21-29. (in Chinese)
[85]
张豫生, 莫耀升. 盘道岭隧洞泥流滑移塌方段处理的施工经验[J]. 甘肃水利水电技术, 1994(1): 62-64.
ZHANG Y S, MO Y S. Construction experience of mud flow sliding collapse section of Pan Daoling tunnel[J]. Gansu Water Conservancy and Hydropower Technology, 1994(1): 62-64. (in Chinese)
[86]
闫瑞生, 刘攀宇, 王佳凤. 西安地铁隧道涌水大变形及坍方处理技术[J]. 现代隧道技术, 2013, 50(6): 179-183.
YAN R S, LIU P Y, WANG J F. Water gushing deformation and collapse treatment technology of Xi'an subway tunnel[J]. Modern Tunnel Technology, 2013, 50(6): 179-183. DOI:10.3969/j.issn.1009-6582.2013.06.028 (in Chinese)
[87]
BARTON N, LIEN R, LUNDE J. Engineering classification of rock masses for the design of tunnel support[J]. Rock mechanics, 1974, 6(4): 189-236. DOI:10.1007/BF01239496
[88]
BARTON N. Some new Q-value correlations to assist in site characterisation and tunnel design[J]. International journal of rock mechanics and mining sciences, 2002, 39(2): 185-216. DOI:10.1016/S1365-1609(02)00011-4
[89]
GRIMSTAD E. Updating the Q-system for NMT[C]//Proceedings of the International Symposium on Sprayed Concrete-Modern Use of Wet Mix Sprayed Concrete for underground support, Fagemes, Oslo, Norwegian Concrete Association, 1993: 31-44.
[90]
徐芝纶. 弹性力学[M]. 北京: 高等教育出版社, 1990.
XU Z L. Elasticity[M]. Beijing: Higher Education Press, 1990. (in Chinese)
[91]
徐秉业, 刘信声. 应用弹塑性力学[M]. 北京: 清华大学出版社, 1995.
XU B Y, LIU X S. Application of elastoplastic mechanics[M]. Beijing: Tsinghua University Press, 1995. (in Chinese)
[92]
BJORKMAN G, RICHARDS R. Harmonic holes-an inverse problem in elasticity[J]. Journal of Applied Mechanics, 1976, 43(3): 414-418. DOI:10.1115/1.3423882
[93]
RICHARDS R, BJORKMAN G. Optimum shapes for unlined tunnels and cavities[J]. Engineering Geology, 1978, 12: 171-179. DOI:10.1016/0013-7952(78)90010-8
[94]
孙焕纯, 张巨勇, 严国梅, 等. 弹性平面孔洞形状优化复变函数方法[J]. 应用数学和力学, 1987, 8(2): 133-141.
SUN H C, ZHANG J Y, YAN G M, et al. Complex variable function method for shape optimization of elastic plane holes[J]. Applied Mathematics and Mechanics, 1987, 8(2): 133-141. (in Chinese)
[95]
薛玺成, 杨万斌. 地下洞室断面形状的优化计算方法[J]. 岩土工程学报, 1999, 21(2): 9-12.
XUE X C, YANG W B. Optimization of section shape of underground caverns[J]. Journal of Geotechnical Engineering, 1999, 21(2): 9-12. (in Chinese)
[96]
曾中林.单拱四车道公路隧道断面设计优化与施工力学研究[D].长沙: 中南大学, 2006.
ZENG Z L. Section design optimization and construction mechanics research of single-arch four-lane highway tunnel[D]. Changsha: Central South University, 2006. (in Chinese) http://www.wanfangdata.com.cn/details/detail.do?_type=degree&id=Y1085376