Please wait a minute...
 首页  期刊介绍 期刊订阅 联系我们
 
最新录用  |  预出版  |  当期目录  |  过刊浏览  |  阅读排行  |  下载排行  |  引用排行  |  百年期刊
Journal of Tsinghua University(Science and Technology)    2017, Vol. 57 Issue (10) : 1076-1082     DOI: 10.16511/j.cnki.qhdxxb.2017.25.048
CIVIL ENGINEERING |
The mode and process of BIM-aided construction management
GUO Hongling, PAN Zaiyi
Department of Construction Management, Tsinghua University, Beijing 100084, China
Download: PDF(1440 KB)  
Export: BibTeX | EndNote | Reference Manager | ProCite | RefWorks    
Abstract  BIM (building information modeling) is a promising approach for improving the efficiency of the construction industry, but it is mainly used in the planning and design of construction projects, with less use during construction. Although some research has been done to promote BIM during construction, most research has focused on the development of BIM methods with little work on the management and organization needed to implement BIM. This paper describes how to efficiently implement BIM during the construction phase by analyzing problems related to traditional construction management approaches. A conceptual framework is given for a BIM-aided construction management platform, which consists of a simulated BIM system and a real-time BIM system to further promote system implementation. This research will benefit application of BIM during the construction phase, as well as a comprehensive information management system.
Keywords BIM      implementation process      construction management     
ZTFLH:  TU711  
Issue Date: 15 October 2017
Service
E-mail this article
E-mail Alert
RSS
Articles by authors
GUO Hongling
PAN Zaiyi
Cite this article:   
GUO Hongling,PAN Zaiyi. The mode and process of BIM-aided construction management[J]. Journal of Tsinghua University(Science and Technology), 2017, 57(10): 1076-1082.
URL:  
http://jst.tsinghuajournals.com/EN/10.16511/j.cnki.qhdxxb.2017.25.048     OR     http://jst.tsinghuajournals.com/EN/Y2017/V57/I10/1076
  
  
  
  
  
  
[1] 邓波, 李云, 程广仁. BIM技术在施工企业中应用方式的探究[J]. 山东建筑大学学报, 2014, 29(2):182-186.DENG Bo, LI Yun, CHENG Guangren. Study on application mode of BIM technique in construction enterprises[J]. Journal of Shandong Jianzhu University, 2014, 29(2):182-186. (in Chinese)
[2] 刘献伟, 高洪刚, 王续胜. 施工领域BIM应用价值和实施思路[J]. 施工技术, 2012, 41(22):84-86.LIU Xianwei, GAO Honggang, WANG Xusheng. Values and idea on the implementation of BIM in construction field[J]. Construction Technology, 2012, 41(22):84-86. (in Chinese)
[3] 蒋爱明, 黄苏. BIM虚拟施工技术在工程管理中的应用[J]. 施工技术, 2014, 43(15):86-89.JIANG Aiming, HUANG Su. Application of BIM virtual construction technology in project management[J]. Construction Technology, 2014, 43(15):86-89. (in Chinese)
[4] Li H, Chan N, Huang T, et al. Optimizing construction planning schedules by virtual prototyping enabled resource analysis[J]. Automation in Construction, 2009, 18(7):912-918.
[5] 赵彬, 王友群, 牛博生. 基于BIM的4D虚拟建造技术在工程项目进度管理中的应用[J]. 建筑经济, 2011(9):93-95.ZHAO Bin, WANG Youqun, NIU Bosheng. Application of BIM-based 4D virtual construction technology in project schedule management[J]. Construction Echonomy, 2011(9):93-95. (in Chinese)
[6] 张建平, 范酷, 王阳利. 基于4D-BIM的施工资源动态管理与成本实时监控[J]. 施工技术, 2011, 40(4):37-40.ZHANG Jianping, FAN Ku, WANG Yangli. Resource dynamic management and cost real-time monitoring in building construction based on 4D-BIM[J]. Construction Technology, 2011, 40(4):37-40. (in Chinese)
[7] 郑浩凯. 基于BIM的建设项目施工成本控制研究[D]. 长沙:中南林业科技大学, 2014.ZHENG Haokai. The Research on Construction Project Cost Control Based on BIM[D]. Changsha:Central South University of Forestry and Technology, 2014. (in Chinese)
[8] 郭红领, 刘文平, 张伟胜. 集成BIM和PT的工人不安全行为预警系统研究[J]. 中国安全科学学报, 2014, 24(4):104-109.GUO Hongling, LIU Wenping, ZHANG Weisheng. A BIM-PT-integrated warning system for on-site workers' unsafe behavior[J]. China Safety Science Journal, 2014, 24(4):104-109. (in Chinese)
[9] 李海涛. 基于BIM的建筑工程施工安全管理研究[D]. 郑州:郑州大学, 2014.LI Haitao. The Research of Construction Safety Management Based on BIM in Building Engineering[D]. Zhengzhou:Zhengzhou University, 2014. (in Chinese)
[10] Chen L J, Luo H. A BIM-based construction quality management model and its applications[J]. Automation in Construction, 2014, 46(10):64-73.
[11] Kang L S, Kim S K, Moon H S, et al. Development of a 4D object-based system for visualizing the risk information of construction projects[J]. Automation in Construction, 2013, 31(3):186-203.
[12] 柳娟花. 基于BIM的虚拟施工技术应用研究[D]. 西安:西安建筑科技大学, 2012.LIU Juanhua. Virtual Construction Technology Based-on BIM[D]. Xi'an:Xi'an University of Architecture and Technology, 2012. (in Chinese)
[13] 张建平, 李丁, 林佳瑞, 等. BIM在工程施工中的应用[J]. 施工技术, 2012, 41(8):10-17.ZHANG Jianping, LI Ding, LIN Jiarui, et al. Application of BIM in engineering construction[J]. Construction Technology, 2012, 41(8):10-17. (in Chinese)
[14] Brilakis I, Lourakis M, Sacks R, et al. Toward automated generation of parametric BIMs based on hybrid video and laser scanning data[J]. Advanced Engineering Informations, 2010, 24(4):456-465.
[15] 张康照. 基于BIM实时模型的施工进度监测系统研究[D]. 天津:天津大学, 2012. ZHANG Kangzhao. Study on an Automated Construction Process Monitoring System Based on BIM As-built Model[D]. Tianjin:Tianjin University, 2012. (in Chinese)
[16] Dossick C S, Neff G. Organizational divisions in BIM-enabled commercial construction[J]. Journal of Construction Engineering & Management, 2009, 136(4):459-467.
url: http://dx.doi.org/al of Construction Engineering
[17] Eastman C, Teicholz P, Sacks R, et al. BIM Handbook:A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors[M]. Hoboken:John Wiley and Sons, 2008.
[18] Taylor J E. Antecedents of successful three-dimensional computer-aided design implementation in design and construction networks[J]. Journal of Construction Engineering & Management, 2007, 133(12):993-1002.
url: http://dx.doi.org/al of Construction Engineering
[19] Cao D, Li H, Wang G. Impacts of isomorphic pressures on BIM adoption in construction projects[J]. Journal of Construction Engineering & Management, 2014, 140(12), 04014056.
url: http://dx.doi.org/al of Construction Engineering
[20] Kymmell W. Building Information Modeling:Planning and Managing Construction Projects with 4D CAD and Simulations[M]. New York:McGraw-Hill, 2008.
[1] LIU Guangyu, AN Peng, WU Zhen, HU Zhenzhong. Ontology-based modeling and application of highway engineering safety knowledge[J]. Journal of Tsinghua University(Science and Technology), 2024, 64(2): 224-234.
[2] CAO Xinying, MENG Fanfan, LI Xiaodong. Intelligent identification of rework risk in the prefabricated construction process based on lean management[J]. Journal of Tsinghua University(Science and Technology), 2023, 63(2): 201-209.
[3] XIONG Qian, TANG Wenzhe. Text mining-based patent analysis on informatization for construction management of hydraulic engineering projects[J]. Journal of Tsinghua University(Science and Technology), 2023, 63(2): 223-232.
[4] LOU Changsheng, TANG Wenzhe, WANG Tengfei. Risk management of water conservancy projects: Taking water conservancy projects in Ningxia as an example[J]. Journal of Tsinghua University(Science and Technology), 2023, 63(2): 233-241.
[5] LOU Changsheng, TANG Wenzhe, WANG Zhongjing. Integrated risk management of water affairs in Xiong'an New Area[J]. Journal of Tsinghua University(Science and Technology), 2023, 63(2): 264-271.
[6] WU Zekun, ZHANG Yakun, ZHANG Xuteng, TANG Wenzhe, QIANG Maoshan. Information management of water conservancy project partnering[J]. Journal of Tsinghua University(Science and Technology), 2022, 62(8): 1351-1356.
[7] GUO Hongling, YE Xiaotian, REN Qipeng, LUO Zhubang. Automatic generation of construction schedules based on BIM and rule reasoning[J]. Journal of Tsinghua University(Science and Technology), 2022, 62(2): 189-198.
[8] HU Zhenzhong, LENG Shuo, YUAN Shuang. BIM-based, data-driven method for intelligent operation and maintenance[J]. Journal of Tsinghua University(Science and Technology), 2022, 62(2): 199-207.
[9] CAO Bingyong, SHI Xinxin. Conversion of EICAD route data based on the IFC 4.1 standard[J]. Journal of Tsinghua University(Science and Technology), 2022, 62(2): 321-330.
[10] GUO Hongling, ZHOU Ying, YE Xiaotian, LUO Zhubang, XUE Fan. Automated mapping from an IFC data model to a relational database model[J]. Journal of Tsinghua University(Science and Technology), 2021, 61(2): 152-160.
[11] LIN Jiarui, GUO Jianfeng. BIM-based automatic compliance checking[J]. Journal of Tsinghua University(Science and Technology), 2020, 60(10): 873-879.
[12] LIN Jiarui, ZHANG Jianping. Data conversion and sharing for building performance analyses based on IFC[J]. Journal of Tsinghua University(Science and Technology), 2016, 56(9): 997-1002.
[13] LIU Qiang, ZHANG Jianping, HU Zhenzhong. Key-value cache based IFC model implementation for web environments[J]. Journal of Tsinghua University(Science and Technology), 2016, 56(4): 348-353,359.
[14] HU Zhenzhong, CHEN Xiangxiang, WANG Liang, HE Tianfeng. BIM-based design method for prefabricated pipeline components[J]. Journal of Tsinghua University(Science and Technology), 2015, 55(12): 1269-1275.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
Copyright © Journal of Tsinghua University(Science and Technology), All Rights Reserved.
Powered by Beijing Magtech Co. Ltd