Please wait a minute...
 首页  期刊介绍 期刊订阅 联系我们
 
最新录用  |  预出版  |  当期目录  |  过刊浏览  |  阅读排行  |  下载排行  |  引用排行  |  百年期刊
Journal of Tsinghua University(Science and Technology)
HYDRAULIC ENGINEERING |
Effect of errors in predicting the water hammer types and pressures in a simple pipeline
ZHANG Ming1, ZHENG Shuangling1, MA Jiming1, QI Wenbiao2
1. State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beijing 100084, China;
2. Jilin Province Water Resource and Hydropower Consultative Company, Changchun 130021, China
Download: PDF(1320 KB)  
Export: BibTeX | EndNote | Reference Manager | ProCite | RefWorks    
Abstract  The analysis of water hammer in a simple pipeline is a fundamental problem in hydropower station designs. The type and evaluation of maximum water hammer in simple pipeline during the uniform closure or opening of a hydraulic turbine is studied. In particular, the type prediction is rectified for negative water hammer. The accurate simplified models for the prediction of positive and negative indirect water hammers are proposed to replace curves in the indirect water hammer domains with straight lines. With these models, possible errors due to inaccurate predictions of the water hammer in the simplified water hammer evaluation model currently adopted in the hydroelectric engineering are illustrated comparatively. A method is given for directly determining the maximum indirect water hammer pressure, no longer needing the prior prediction of first-phase or end-phase water hammer. In addition, formulas are given for the indirect water hammer without solving all the equations. The validity and applicability of the water hammer prediction and evaluation, including the method and formulas for indirect water hammer, are verified by examples.
Keywords hydropower station      simple pipeline      water hammer      analytical method      opening degree     
ZTFLH:  TV732.4  
Just Accepted Date: 20 September 2017   Issue Date: 15 September 2017
Service
E-mail this article
E-mail Alert
RSS
Articles by authors
ZHANG Ming
ZHENG Shuangling
MA Jiming
QI Wenbiao
Cite this article:   
ZHANG Ming,ZHENG Shuangling,MA Jiming, et al. Effect of errors in predicting the water hammer types and pressures in a simple pipeline[J]. Journal of Tsinghua University(Science and Technology), 10.16511/j.cnki.qhdxxb.2017.26.052
URL:  
http://jst.tsinghuajournals.com/EN/10.16511/j.cnki.qhdxxb.2017.26.052     OR     http://jst.tsinghuajournals.com/EN/Y2017/V57/I9/986
  
  
  
  
  
  
[1] 王仁坤, 张春生. 水工设计手册:第8卷水电站建筑物[M]. 2版. 北京:中国水利水电出版社, 2013.WANG Renkun, ZHANG Chunsheng. Hydraulic Design Handbook:Volume 8 Hydropower Station Buildings[M]. 2nd ed. Beijing:China Water & Power Press, 2013. (in Chinese)
[2] DL5077-1997. 水工建筑物荷载设计规范[S]. 北京:中华人民共和国电力工业部, 1998.DL5077-1997. Specifications for Load Design of Hydraulic Structures[S]. Beijing:Electric Power Industry Ministry of the People's Republic of China, 1998. (in Chinese)
[3] Zhang Y L, Miao M F, Ma J M. Analytical study on water hammer pressure in pressurized conduits with a throttled surge chamber for slow closure[J]. Water Science and Engineering, 2010, 3(2):174-189.
[4] Mansuri B, Salmasi F, Oghati B. Sensitivity analysis for water hammer problem in pipelines[J]. Iranica Journal of Energy & Environment, 2014, 5(2):124-131.
url: http://dx.doi.org/ca Journal of Energy
[5] Emadi J, Solemani A. Maximum water hammer sensitivity analysis[J]. World Academy of Science, Engineering and Technology, 2011, 5(1):17-20.
[6] Choon T W, Aik L K, Aik L E, et al. Investigation of water hammer effect through pipeline system[J]. International Journal on Advanced Science Engineering Information Technology, 2012, 2(3):48-53.
[7] Ghidaoui M S, Zhao M, McInnis D A, et al. A review of water hammer theory and practice[J]. Applied Mechanics Reviews, 2005, 58(1):49-76.
[8] Yang J D, Wu R Q. On the basic equations of water hammer[J]. Journal of Hydrodynamics, 1996, 8(2):62-71.
[9] 杨玲霞, 李树慧, 侯咏梅, 等. 水击基本方程的改进[J]. 水利学报, 2007, 38(8):948-952.YANG Lingxia, LI Shuhui, HOU Yongmei, et al. Improvement of fundamental equation of water hammer[J]. Journal of Hydraulic Engineering, 2007, 38(8):948-952. (in Chinese)
[10] 李树慧. 水击方程的完善与计算研究[D]. 郑州:郑州大学, 2006.LI Shuhui. Study on the Improvement and Calculation of Water Hammer Equation[D]. Zhengzhou:Zhengzhou University, 2006. (in Chinese)
[11] 董晨钟. 水击基本理论研究[D]. 郑州:郑州大学, 2014.DONG Chenzhong. Study on the Basic Theory of Water Hammer[D]. Zhengzhou:Zhengzhou University, 2014. (in Chinese)
[12] 黄李冰. 水击计算方法和水击理论研究[D]. 郑州:郑州大学, 2012.HUANG Libing. Study on the Method for Calculation and the Theory of Water Hammer[D]. Zhengzhou:Zhengzhou University, 2012. (in Chinese)
[13] Wang C, Yang J D. Water hammer simulation using explicit-implicit coupling methods[J]. Journal of Hydraulic Engineering, 2015, 141(4):04014086.
[14] Zhou Z X, Keat T S. Theoretical, numerical and experimental study of water hammer in pipe system with column surge chamber[J]. Journal of Hydrodynamics, 2003, 15(5):20-28.
[15] 邓东明. 压力管道最大压力计算控制条件的探讨[J]. 云南水力发电, 2006, 22(3):27-28.DENG Dongming. Discussion on the control conditions for calculation of maximum pressure in penstock[J]. Yunnan Water Power, 2006, 22(3):27-28. (in Chinese)
[16] 克利夫琴科·Г И. 水力发电厂的水锤及水轮机合理调节程序[M]. 张昌龄, 译. 北京:电力工业出版社, 1956.Кривценко Г И. Water Hammer in Hydropower Plant and the Reasonable Adjustment Procedure of Turbine[M]. ZHANG Changling, trans. Beijing:China Electric Power Press, 1956. (in Chinese)
[17] 莫斯特柯夫·M A, 巴什基洛夫·A A. 水锤计算[M]. 王世泽, 译. 北京:燃料工业出版社, 1955.Мостков М А, Башкиров А А. Calculation of Water Hammer[M]. Wang Shize, trans. Beijing:Fuel Industry Press, 1955. (in Chinese)
[18] Berlin V V, Murav'ev O A. Governing the turbine-generator unit of a small-scale hydropower plant with a long penstock[J]. Power Technology and Engineering, 2015, 49(4):240-244.
[1] CHEN Yongcan, CHEN Jiajie, WANG Haoran, GONG Yu, FENG Yue, LIU Zhaowei, QI Ningchun, LIU Mei, LI Yonglong, XIE Hui. Key technology of underwater inspection robot system for large diameter and long headrace tunnel[J]. Journal of Tsinghua University(Science and Technology), 2023, 63(7): 1015-1031.
[2] QI Ningchun, NIE Qiang, LAI Jitao, CHEN Yongcan, LI Yonglong. Key technology and practice of intelligent underwater inspection in multiple scenarios of hydropower station[J]. Journal of Tsinghua University(Science and Technology), 2023, 63(7): 1124-1134.
[3] YANG Linqing, QIN Benke, BO Hanliang. Energy analysis method of junction coupling[J]. Journal of Tsinghua University(Science and Technology), 2023, 63(5): 840-848.
[4] FAN Qixiang, LIN Peng, JIANG Shu, WEI Pengcheng, LI Guo. Review on the rock mechanics and engineering practice for large hydropower stations along the downstream section of the Jinsha River[J]. Journal of Tsinghua University(Science and Technology), 2020, 60(7): 537-556.
[5] LUO Guanjun, WANG Kexiang, GUO Zengguang, TAN Yaosheng, AWANG Jiacuo. Consolidation grouting methods for riverbed rock mass coverings of complex dam foundations[J]. Journal of Tsinghua University(Science and Technology), 2020, 60(7): 575-581.
[6] HUANG Wei, WEI Pengcheng. Key methods for non-cover-weight consolidation grouting of super high dam foundations[J]. Journal of Tsinghua University(Science and Technology), 2020, 60(7): 582-588.
[7] Xiangfeng LIU, Chen XU, Weifeng HUANG. Analysis and parametric design of the dynamics of a dry gas seal for extreme operating conditions using a semi-analytical method[J]. Journal of Tsinghua University(Science and Technology), 2014, 54(2): 223-228.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
Copyright © Journal of Tsinghua University(Science and Technology), All Rights Reserved.
Powered by Beijing Magtech Co. Ltd