Resource-constrained project scheduling problem considering productivity and construction methods
WANG Hengwei, LIN Jiarui, ZHANG Jianping
Department of Civil Engineering, Tsinghua University, Beijing 100084, China
Download: PDF(2238 KB)  
Export: BibTeX | EndNote | Reference Manager | ProCite | RefWorks    
Abstract  The multimode resource-constrained project scheduling problem (MRCPSP) is an essential mathematical model for construction schedule optimization. However, such models cannot easily simultaneously represent multiple relationships between activity duration, cost, and resource requirements. This paper presents an MRCPSP model that includes multiple relationships that is solved using constraint programming (CP). The model represents the relationships between activity duration, cost, and resource requirements by introducing a productivity function and the total resource requirements for combinations of activities. The model can simulate the construction productivity changes and the influence of construction methods on the results. The results then have a more explicit engineering meaning to improve actual projects than the traditional MRCPSP.
Keywords construction schedule optimization      resource-constrained project scheduling problem (RCPSP)      constraint programming (CP)      mathematical modeling     
Issue Date: 03 March 2020
Service
E-mail this article
E-mail Alert
RSS
Articles by authors
WANG Hengwei
LIN Jiarui
ZHANG Jianping
Cite this article:   
WANG Hengwei,LIN Jiarui,ZHANG Jianping. Resource-constrained project scheduling problem considering productivity and construction methods[J]. Journal of Tsinghua University(Science and Technology), 2020, 60(3): 271-277.
URL:  
http://jst.tsinghuajournals.com/EN/10.16511/j.cnki.qhdxxb.2019.21.035     OR     http://jst.tsinghuajournals.com/EN/Y2020/V60/I3/271
  
  
  
  
  
  
  
  
  
  
[1] GIRAN O, TEMUR R, BEKDAŞ G. Resource constrained project scheduling by harmony search algorithm[J]. KSCE Journal of Civil Engineering, 2017, 21(2):479-487. DOI:10.1007/s12205-017-1363-6.
[2] KASRAVI M, MAHMOUDI A, FEYLIZADEH M R. A novel algorithm for solving resource-constrained project scheduling problems:A case study[J]. Journal of Advances in Management Research, 2019, 16(2):194-215.
[3] BRUCKER P, DREXL A, MÖHRING R, et al. Resource-constrained project scheduling:Notation, classification, models, and methods[J]. European Journal of Operational Research, 1999, 112(1):3-41. DOI:10.1016/s0377-2217(98)00204-5.
[4] BLAZEWICZ J, LENSTRA J K, KAN A H G R. Scheduling subject to resource constraints:Classification and complexity[J]. Discrete Applied Mathematics, 1983, 5(1):11-24. DOI:10.1016/0166-218x(83)90012-4.
[5] MENESI W, HEGAZY T. Multimode resource-constrained scheduling and leveling for practical-size projects[J]. Journal of Management in Engineering, 2015, 31(6):04014092. DOI:10.1061/(ASCE)ME.1943-5479.0000338.
[6] LIU S S, WANG C J. Resource-constrained construction project scheduling model for profit maximization considering cash flow[J]. Automation in Construction, 2008, 17(8):966-974. DOI:10.1016/j.autcon.2008.04.006.
[7] LIU J, LU M. Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints[J]. Journal of Construction Engineering and Management, 2018, 144(7):0401804. DOI:10.1061/(ASCE)CO.1943-7862.0001507.
[8] MENESI W, GOLZARPOOR B, HEGAZY T. Fast and near-optimum schedule optimization for large-scale projects[J]. Journal of Construction Engineering and Management, 2013, 139(9):1117-1124. DOI:10.1061/(ASCE)CO.1943-7862.0000722.
[9] ABUWARDA Z, HEGAZY T. Flexible activity relations to support optimum schedule acceleration[J]. Journal of Construction Engineering and Management, 2016, 142(11):06016004. DOI:10.1061/(ASCE)CO.1943-7862.0001193.
[10] GOLNARAGHI S, ZANGENEHMADAR Z, MOSELHI O, et al. Application of artificial neural network(s) in predicting formwork labour productivity[J]. Advances in Civil Engineering, 2019, 2019:5972620. DOI:10.1155/2019/5972620.
[11] GARCÍA-NIEVES J D, PONZ-TIENDA J L, SALCEDO-BERNAL A, et al. The multimode resource-constrained project scheduling problem for repetitive activities in construction projects[J]. Computer-aided Civil and Infrastructure Engineering, 2018, 33(8):655-671. DOI:10.1111/mice.12356.
[12] ABUWARDA Z, HEGAZY T. Work-package planning and schedule optimization for projects with evolving constraints[J]. Journal of Computing in Civil Engineering, 2016, 30(6):04016022. DOI:10.1061/(ASCE)CP.1943-5487.0000587.
[13] 刘雪红, 程海寅, 陆建飞, 等. 铝合金模板体系施工技术及其效益分析[J]. 施工技术, 2012, 41(23):79-82, 104. LIU X H, CHENG H Y, LU J F, et al. Construction technology of aluminum alloy formwork system and its benefit analysis[J]. Construction Technology, 2012, 41(23):79-82, 104. (in Chinese)
No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
Copyright © Journal of Tsinghua University(Science and Technology), All Rights Reserved.
Powered by Beijing Magtech Co. Ltd