Research Article |
|
|
|
|
|
Intelligent cooling control of roller-compacted concrete dam during dam gap diversion |
LI Ming1, LIN Peng1, LI Zichang2, LIU Yuanguang3, ZHANG Rui3, GAO Xiangyou4 |
1. Department of Hydraulic Engineering, Tsinghua University, Beijing 100084, China; 2. Sichuan Energy Internet Research Institute, Tsinghua University, Chengdu 610000, China; 3. Sinohydrd Bureau 11 Co., Ltd., Zhengzhou 450001, China; 4. TSCON(Wuhan) Technology Co., Ltd., Wuhan 430074, China |
|
|
Abstract Diverting flood via a dam gap or diversion tunnel is an economical and efficient method for the construction of a roller-compacted concrete (RCC) dam during the flood season. However, in the tropical climate of Africa, dam-gap diversion has a great influence on the dam temperature and stress field, which increases the risk of surface cracking. This paper analyzes dam temperature and stress evolution characteristics in high-temperature climatic conditions in tropical areas and develops a method for dam-gap intelligent temperature monitoring and feedback control. Relying on the Nyerere hydropower project, which has the largest installed capacity in East Africa, this paper adopts simulation, equipment development, and field application methods. A three-dimensional finite element model of the Nyerere hydroelectric dam during construction was established. The simulation boundary conditions were determined by the measured dam and river water temperatures. The dam gap concrete temperature and stress field were simulated under water pipe cooling conditions lasting for 0, 7, 14, and 21 d after pouring. After water pipe cooling, in the dam's elevation (EL) 77.0—95.0 m area, the temperature of the overwater surface concrete was not affected remarkably, but the internal temperature of the dam was remarkably reduced. The tensile stress on the overwater surface of the dam gap increased rapidly within a few days after the start of dam-gap diversion. The tensile stress continued to increase gradually and reached a peak at the end of the dam gap diversion. Furthermore, the self-developed intelligent temperature control system 2.0 was used to monitor and control dam body temperature throughout the dam-gap diversion period and to dynamically adjust the cooling strategy. The main findings were as follows: (1) This article revealed the temperature and stress field evolution characteristics of the dam under different water cooling schemes during the dam-gap diversion stage. A large temperature gradient was generated in the area within 3 m of the overwater surface. The maximum surface temperature stress without water cooling measures reached 2.04 MPa, which exceeded the allowable tensile stress. The risk of cracking could be effectively reduced by reducing the internal temperature of the dam. (2) An intelligent temperature control strategy for hot climate conditions was proposed. It is recommended that the EL 77.0—95.0 m area of the dam was water pipe cooled for at least 7 d and that the temperature at 2 m below the water crossing surface was cooled to <34.0 ℃ before dam-gap diversion. (3) An intelligent cooling control system 2.0 was developed. This system could intelligently regulate the cooling water temperature and flow supply and change the cooling water flow direction at regular intervals. It could effectively improve the concrete cooling effect, reduce the cooling energy consumption, and cool the dam temperature to the target temperature range before dam-gap diversion. The post-flood inspection detected no temperature cracks. It is indicated that the combination of temperature control simulation and the intelligent cooling control system 2.0 can effectively solve the temperature cracking problem in dam gaps. The study is of great significance for preventing RCC dam gaps from temperature cracks and can be used as a reference point for similar projects.
|
Keywords
roller-compacted concrete dam
dam-gap diversion
intelligent cooling control
intelligent temperature control
Julius Nyerere hydropower project
|
Issue Date: 27 June 2023
|
|
|
[1] 国家能源局.水电工程施工导流设计规范:NB/T 35041-2014[S].北京:中国电力出版社, 2014. National Energy Administration. Design code of construction diversion for hydropower engineering:NB/T 35041-2014[S]. Beijing:China Electric Power Press, 2014.(in Chinese) [2] International Hydropower Association. 2022 Hydropower status report[R/OL].(2022-07-05)[2022-10-20]. https://www.hydropower.org/status-report. [3] International Energy Agency. Africa energy outlook 2022[R/OL].(2022-06-01)[2022-10-20]. https://www.iea.org/reports/africa-energy-outlook-2022. [4] 矫勇.中国大坝70年[M].北京:中国三峡出版社, 2021. JIAO Y. 70 years of DAMS in China[M]. Beijing:China Three Gorges Press, 2021.(in Chinese) [5] 朱伯芳.大体积混凝土温度应力与温度控制[M]. 2版.北京:中国水利水电出版社, 2012. ZHU B F. Temperature stress and temperature control of mass concrete[M]. 2nd ed. Beijing:China Water Power Press, 2012.(in Chinese) [6] 吕琦.碾压混凝土重力坝缺口度汛三维有限元温控仿真分析[D].西安:西安理工大学, 2007. Lü Q. 3-D fem simulation analysis of temperature control about the breach flow of the RCC gravity DAM[D]. Xi'an:Xi'an University of Technology, 2007.(in Chinese) [7] 李松辉,张国新,张湘涛,等.高碾压混凝土重力坝施工度汛缺口坝段温控防裂措施研究[J].水利水电技术, 2013, 44(7):56-58, 68. LI S H, ZHANG G X, ZHANG X T, et al. Study on temperature control and anti-cracking measure on dam section of flood-discharge gap during construction of high RCC gravity dam[J]. Water Resources and Hydropower Engineering, 2013, 44(7):56-58, 68.(in Chinese) [8] CHEN H J, LIU Z B. Temperature control and thermal-induced stress field analysis of GongGuoQiao RCC dam[J]. Journal of Thermal Analysis and Calorimetry, 2019, 135(4):2019-2029. [9] 王敬静,王南,何蕴龙,等.碾压混凝土重力坝度汛缺口温控分析[J].水电与新能源, 2016, 30(7):1-5. WANG J J, WANG N, HE Y L, et al. Thermal analysis of the preset flood discharging gap in a roller compacted concrete gravity dam[J]. Hydropower and New Energy, 2016, 30(7):1-5.(in Chinese) [10] 史添翼,何蕴龙,方超.西南地区碾压混凝土坝度汛缺口温控分析[J].武汉大学学报(工学版), 2019, 52(6):489-496. SHI T Y, HE Y L, FANG C. Analysis of temperature control of flood discharging gap in RCC dam[J]. Engineering Journal of Wuhan University, 2019, 52(6):489-496.(in Chinese) [11] 林鹏,李庆斌,周绍武,等.大体积混凝土通水冷却智能温度控制方法与系统[J].水利学报, 2013, 44(8):950-957. LIN P, LI Q B, ZHOU S W, et al. Intelligent cooling control method and system for mass concrete[J]. Journal of Hydraulic Engineering, 2013, 44(8):950-957.(in Chinese) [12] 林鹏,樊启祥,汪志林,等.一种介质换热智能控制系统及方法:110006284B[P]. 2020-05-15. LIN P, FAN Q X, WANG Z L, et al. An intelligent cooling control system and method for medium heat transfer:110006284B[P]. 2020-05-15.(in Chinese) [13] 林鹏,宁泽宇,李明,等.特高拱坝通水冷却管网智能联控原型试验研究[J].水利学报, 2021, 52(7):819-828. LIN P, NING Z Y, LI M, et al. Study on prototype intelligent control test of cooling pipeline for a super-high arch dam[J]. Journal of Hydraulic Engineering, 2021, 52(7):819-828.(in Chinese) [14] 宁泽宇,林鹏,彭浩洋,等.混凝土实时温度数据移动平均分析方法及应用[J].清华大学学报(自然科学版), 2021, 61(7):681-687. NING Z Y, LIN P, PENG H Y, et al. Moving-average calculations for real-time concrete temperature monitoring[J]. Journal of Tsinghua University (Science and Technology), 2021, 61(7):681-687.(in Chinese) [15] 樊启祥,林鹏,魏鹏程,等.智能建造闭环控制理论[J].清华大学学报(自然科学版), 2021, 61(7):660-670. FAN Q X, LIN P, WEI P C, et al. Closed-loop control theory of intelligent construction[J]. Journal of Tsinghua University (Science and Technology), 2021, 61(7):660-670.(in Chinese) [16] 林鹏,李明,刘科,等.低热水泥碾压混凝土坝适应性智能通水策略研究[J].水利学报, 2022, 53(9):1028-1038. LIN P, LI M, LIU K, et al. Study on adaptive intelligent cooling strategy for low-heat cement RCC[J]. Journal of Hydraulic Engineering, 2022, 53(9):1028-1038.(in Chinese) [17] 谭尧升,樊启祥,汪志林,等.白鹤滩特高拱坝智能建造技术与应用实践[J].清华大学学报(自然科学版), 2021, 61(7):694-704. TAN Y S, FAN Q X, WANG Z L, et al. Intelligent construction methods for the Baihetan super high arch dam[J]. Journal of Tsinghua University (Science and Technology), 2021, 61(7):694-704.(in Chinese) [18] 张国新,刘毅,刘有志,等.高混凝土坝温控防裂研究进展[J].水利学报, 2018, 49(9):1068-1078. ZHANG G X, LIU Y, LIU Y Z, et al. Reviews on temperature control and crack prevention of high concrete dam[J]. Journal of Hydraulic Engineering, 2018, 49(9):1068-1078.(in Chinese) |
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|