1. State Key Laboratory of Hydroscience and Engineering,Tsinghua University, Beijing 100084, China 2. China Three Gorges Corporation, Beijing 100038, China 3. Shenzhen Pumped Storage Power Co. Ltd,Shenzhen 518115, China
Temperature is an important indicator to evaluate the concrete after it has been build. Traditionally, the concrete temperature is monitored by embedded sensors, but placing these is not convenient during pouring and the sensors can fail. A calculational method that does not need embedded sensors was developed where the concrete temperature field is determined from measured cooling flow temperatures. The mathematical model, instrument layout and monitoring procedure are described in this paper. Predicted temperatures for a domestic large arch dam project compare well with actual measurements to validate the applicability of the method.
United States Department of the Interior Bureau of Reclamation. Cooling of Concrete Dams: Final Reports.[M]. Washington DC, USA: United States Department of the Interior, 1949.
[2]
朱伯芳. 考虑水管冷却效果的混凝土等效热传导方程[J]. 水利学报, 1991, 22(003): 28-34. ZHU Bofang. Equivalent equation of heat conduction in mass concrete considering the effect of pipe cooling[J]. Journal of Hydraulic Engineering , 1991, 22(003): 28-34. (in Chinese)
[3]
朱伯芳. 大体积混凝土温度应力与温度控制 [M]. 北京: 中国电力出版社, 1999 ZHU Bofang. Thermal Stresses and Temperature Control of Mass Concrete [M]. Beijing: China Electric Power Press, 1999. (in Chinese)
[4]
董福品. 考虑表面散热对冷却效果影响的混凝土结构水管冷却等效分析[J]. 水利水电技术, 2001, 32(6): 16-19. DONG Fupin. The method of equal effects of concrete cooling water pipe under the influence upon cooling effect of surface heat releasing[J]. Water Resources and Hydropower Engineering, 2001, 32(6): 16-19. (in Chinese).
[5]
YANG Jian, HU Yu, ZUO Zheng, et al.Thermal analysis of mass concrete embedded with double-layer staggered heterogeneous cooling water pipes[J]. Applied Thermal Engineering , 2012, 35 : 145-156.
[6]
黄耀英, 郑宏, 夏开文,等. 基于等效时间的混凝土水管冷却等效热传导[J]. 华中科技大学学报: 自然科学版, 2012, 40(2): 45-48. HUANG Yaoying, ZHENG Hong, XIA Kaiwen, et al.Study on equivalent heat conduct of concrete using pipe cooling and equivalent time[J]. Journal of Huazhong University of Science and Technology: Nature Science , 2012, 40(2): 45-48. (in Chinese)
[7]
左正, 胡昱, 段云岭,等. 考虑双层异质水管的大体积混凝土施工期温度场仿真[J]. 清华大学学报: 自然科学版, 2012, 52(2): 186-189. ZUO Zheng, HU Yu, DUAN Yunling, et al.Simulation of the temperature field in mass concrete with double layers of cooling pipes during construction[J]. Journal of Tsinghua University: Science and Technology , 2012, 52(2): 186-189. (in Chinese)
[8]
DL/T 5148-2001. 水工建筑物水泥灌浆施工技术规范[S]. 北京:中华人民共和国国家经济贸易委员会, 2001. DL/T 5148-2001. Construction Technology of Cement Grouting of Hydraulic Structure Specification[S]. Beijing: State Economic and Trade Commission of China, 2001. (in Chinese)
[9]
Gilliland J A, Dilger W H. Monitoring concrete temperature during construction of the Confederation Bridge[J]. Canadian Journal of Civil Engineering , 1997, 24(6): 941-950.
[10]
Shaw J J. A Case Study of Mass Concrete Construction for Midwest Boarder Bridges [D]. Ames, USA: Iowa State University, 2012.
[11]
朱伯芳. 混凝土坝的数字监控[J]. 水利水电技术, 2008, 39(2): 15-18. ZHU Bofang. Numerical monitoring of concrete dams[J]. Water Resources And Hydropower Engineering , 2008, 39(2): 15-18. (in Chinese)
[12]
Cengel Y A. Heat and mass transfer: A practical approach 3rd ed.[M]. Boston, USA: McGraw-Hill, 2007
[13]
WU Yong, Ronaldo L. Numerical implementation of temperature and creep in mass concrete[J]. Finite Elements in Analysis and Design , 2001, 37(2): 97-106.
[14]
刘光廷, 胡昱, 王恩志,等. 石门子碾压混凝土拱坝温度场实测与仿真计算[J]. 清华大学学报: 自然科学版, 2002, 42(4): 539-542. LIU Guangting, HU Yu, WANG Enzhi, et al. Analysis and measurement of the temperature field in the Shimenzi RCC arch dam[J]. Journal of Tsinghua University: Science and Technology , 2002, 42(4): 539-542. (in Chinese)
[15]
ZUO Zheng, HU Yu, LI Qingbin, et al. Data mining of the thermal performance of cool-pipes in massive concrete via in-situ monitoring[J]. Mathematical Problems in Engineering , 2014, 2014(Article ID 985659): 1-15.
[16]
SL 352-2006. 水工混凝土试验规程[S]. 北京:中华人民共和国水利部, 2006. SL 352-2006. Test Code for Hydraulic Concrete[S]. Beijing: Ministry of Water Resources of the People's Republic of China, 2006. (in Chinese)
[17]
HU Yu, ZUO Zheng, LI Qingbin, et al.Boolean-based surface procedure for the external heat transfer analysis of dams during construction[J]. Mathematical Problems in Engineering , 2013, 2013(Article ID 175616): 1-17.