Research Article

Overtime warning of concrete pouring interval based on object detection model

  • MEI Jie ,
  • LI Qingbin ,
  • CHEN Wenfu ,
  • WU Kun ,
  • TAN Yaosheng ,
  • LIU Chunfeng ,
  • WANG Dongmin ,
  • HU Yu
Expand
  • 1. Department of Hydraulic Engineering, Tsinghua University, Beijing 100084, China;
    2. China Three Gores Projects Development Co., Ltd., Chengdu 610041, China

Received date: 2021-01-12

  Online published: 2021-06-08

Abstract

Timely, comprehensive and accurate access to the status and progress of various activities on the construction site is essential for quality control, progress tracking and productivity analysis, and is also necessary for the full realization of fine management and intelligent construction. At present, the progress recording and quality control under the concrete pouring construction scenario are still mostly done manually, leading to problems such as insufficient timeliness, misreporting and omission. In this study, the semantic segmentation and object detection technology in the field of deep learning computer vision are applied to the field of engineering construction. Real-time construction progress is obtained by identifying formwork cover ratios and the unloading event of the bucket, and the overtime warning of layer coverage time with second-level accuracy is realized.

Cite this article

MEI Jie , LI Qingbin , CHEN Wenfu , WU Kun , TAN Yaosheng , LIU Chunfeng , WANG Dongmin , HU Yu . Overtime warning of concrete pouring interval based on object detection model[J]. Journal of Tsinghua University(Science and Technology), 2021 , 61(7) : 688 -693 . DOI: 10.16511/j.cnki.qhdxxb.2021.26.016

Outlines

/