[1] 张文静, 相芹. 浅析水利工程建设运行管理工作存在的问题及改善途径[J]. 中国设备工程, 2022(8): 35-36. ZHANG W J, XIANG Q. Analysis on the existing problems and improvement strategy for construction and operation management of water conservancy project[J]. China Plant Engineering, 2022(8): 35-36. (in Chinese)
[2] 中华人民共和国水利部. 回眸水利2021数据见证这一年[EB/OL]. (2022-01-10)[2022-06-05]. http://www.mwr.gov.cn/ztpd/2022ztbd/2022nqgslgzhy/bgjd/202201/t20220110_1559017.html. Ministry of Water Resources of the People's Republic of China. Look back at the data of water conservancy in 2021[EB/OL]. (2022-01-10)[2022-06-05]. http://www.mwr.gov.cn/ztpd/2022ztbd/2022nqgslgzhy/bgjd/202201/t20220110_1559017.html. (in Chinese)
[3] 中华人民共和国水利部. 《2022中国水利发展报告》正式出版[EB/OL]. (2022-06-02)[2022-06-05]. http://www.mwr.gov.cn/xw/slyw/202206/t20220602_1577091.html. Ministry of Water Resources of the People's Republic of China. Report of China's water resources development in2022 has been published[EB/OL]. (2022-06-02)[2022-06-05]. http://www.mwr.gov.cn/xw/slyw/202206/ t20220602_1577091.html. (in Chinese)
[4] LIU Y, TANG W Z, DUFFIELD C F, et al. Improving design by partnering in engineering-procurement-construction (EPC) hydropower projects: A case study of a large-scale hydropower project in China[J]. Water, 2021, 13(23): 3410.
[5] WANG T F, TANG W Z, QI D S, et al. Enhancing design management by partnering in delivery of international EPC projects: Evidence from Chinese construction companies[J]. Journal of Construction Engineering and Management, 2015, 142(4): 04015099.
[6] ARDITI D, ELHASSAN A, TOKLU Y C. Constructability analysis in the design firm[J]. Journal of Construction Engineering and Management, 2002, 128(2): 117-126.
[7] CORNICK T. Quality management for building design[M]. London: Butterworth-Heinemann, 1991.
[8] KOSKELA L, HUOVILA P, LEINONEN J. Design management in building construction: From theory to practice[J]. Journal of Construction Research, 2002, 3(1): 1-16.
[9] LOPEZ R, LOVE P E D, EDWARDS D J, et al. Design error classification, causation, and prevention in construction engineering[J]. Journal of Performance of Constructed Facilities, 2010, 24(4): 399-408.
[10] AHADZIE D K, PROVERBS D G, SARKODIE-POKU I. Competencies required of project managers at the design phase of mass house building projects[J]. International Journal of Project Management, 2014, 32(6): 958-969.
[11] ELFORGANI M S, RAHMAT I. The influence of clients' qualities on green design performance of building projects in Malaysia: Descriptive study[J]. American Journal of Applied Sciences, 2012, 9(10): 1668-1677.
[12] 闫学良, 常彬杰. 业主方的建设工程项目设计管理[J]. 项目管理技术, 2020, 18(8): 128-132. YAN X L, CHANG B J. Design management of owner's construction project[J]. Project Management Technology, 2020, 18(8): 128-132. (in Chinese)
[13] LOVE P E D, LOPEZ R, KIM J T, et al. Influence of organizational and project practices on design error costs[J]. Journal of Performance of Constructed Facilities, 2014, 28(2): 303-310.
[14] TAURIAINEN M, MARTTINEN P, DAVE B, et al. The effects of BIM and lean construction on design management practices[J]. Procedia Engineering, 2016, 164: 567-574.
[15] WEINGARDT R G. Partnering: Building a stronger design team[J]. Journal of Architectural Engineering, 1996, 2(2): 49-54.
[16] ZHANG Q Z, TANG W Z, LIU J, et al. Improving design performance by alliance between contractors and designers in international hydropower EPC projects from the perspective of Chinese construction companies[J]. Sustainability, 2018, 10(4): 1171.
[17] THYSSEN M H, EMMITT S, BONKE S, et al. Facilitating client value creation in the conceptual design phase of construction projects: A workshop approach[J]. Architectural Engineering and Design Management, 2010, 6(1): 18-30.
[18] 包智强. 浅析业主方工程项目设计管理[J]. 建设监理, 2012(11): 9-12. BAO Z Q. Analysis on owners' design management of construction projects[J]. Project Management, 2012(11): 9-12. (in Chinese)
[19] 李大伟. 业主对建设项目的设计管理措施研究[J]. 中国新技术新产品, 2010(1): 57. LI D W. Study on the owners' design management measures for the construction projects[J]. China New Technologies and Products, 2010(1): 57. (in Chinese)
[20] 吴强, 乐云. 项目业主方设计管理方法研究[J]. 项目管理技术, 2012, 10(7): 82-86. WU Q, YUE Y. Study on project owners' design management methods[J]. Project Management Technology, 2012, 10(7): 82-86. (in Chinese)
[21] NEELY A, GREGORY M, PLATTS K. Performance measurement system design: A literature review and research agenda[J]. International Journal of Operations and Production Management, 2005, 25(12): 1228-1263.
[22] BUDAWARA N. Key performance indicators to measure design performance in construction[D]. Montreal: Concordia University, 2009.
[23] ATKINSON R. Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria[J]. International Journal of Project Management, 1999, 17(6): 337-342.
[24] KÄRNÄ S, JUNNONEN J M. Designers' performance evaluation in construction projects[J]. Engineering, Construction and Architectural Management, 2017, 24(1): 154-169.
[25] KOUTSIKOURI D, AUSTIN S, DAINTY A. Critical success factors in collaborative multi-disciplinary design projects[J]. Journal of Engineering, Design and Technology, 2008, 6(3): 198-226.
[26] HYUN C, CHO K, KOO K, et al. Effect of delivery methods on design performance in multifamily housing projects[J]. Journal of Construction Engineering and Management, 2008, 134(7): 468-482.
[27] KNOTTEN V, LÆDRE O, HANSEN G K. Building design management: Key success factors[J]. Architectural Engi- neering and Design Management, 2017, 13(6): 479-493.
[28] 王志军. 我国水利工程设计现状及发展趋势探析[J]. 长江技术经济, 2022, 6(S1): 212-214. WANG Z J. The current situation and development trend of water conservancy project design in China[J]. Technology and Economy of Changjiang, 2022, 6(S1): 212-214. (in Chinese)
[29] MINATO T. Representing causal mechanism of defective designs: A system approach considering human errors[J]. Construction Management and Economics, 2003, 21(3): 297-305.
[30] 刘永庆. 水利工程设计中投资控制探讨[J]. 智能城市, 2020, 6(17): 57-58. LIU Y Q. Study on investment control in water conservancy project design[J]. Intelligent City, 2020, 6(17): 57-58. (in Chinese)
[31] 王国才. 水利工程设计中存在的问题及优化探析[J]. 运输经理世界, 2020(10): 151-152. WANG G C. Study on design problems and design optimization in water conservancy projects[J]. Transport Business China, 2020(10): 151-152. (in Chinese)
[32] 张海波. 农村小型水利工程设计变更原因分析及措施建议[J]. 陕西水利, 2021(6): 214-215. ZHANG H B. Reasons and suggestions for design change of rural small water conservancy projects[J]. Shaanxi Water Resources, 2021(6): 214-215. (in Chinese)
[33] 程炀, 吴泽昊, 严杰, 等. 水利工程设计中的常见问题及对策[J]. 工程建设与设计, 2021(23): 137-139. CHENG Y, WU Z H, YAN J, et al. Common problems in water conservancy engineering design and the counter- measures[J]. Construction and Design for Engineering, 2021(23): 137-139. (in Chinese)
[34] TANG W Z, QIANG M S, DUFFIELD C F, et al. Incentives in the Chinese construction industry[J]. Journal of Construction Engineering and Management, 2008, 134(7): 457-467.
[35] 李闯. 水利工程设计优化激励机制研究[J]. 水利规划与设计, 2019(5): 61-65. LI C. Research on the incentive mechanism for the design optimization of hydraulic projects[J]. Water Resources Planning and Design, 2019(5): 61-65. (in Chinese)
[36] 王梅, 王卓甫, 朱玉彩. 大型水利工程建设项目招标设计博弈模型分析[J]. 土木工程与管理学报, 2014, 31(4): 92-97. WANG M, WANG Z F, ZHU Y C. Analysis on bidding game model of large-scale water conservancy project[J]. Journal of Civil Engineering and Management, 2014, 31(4): 92-97. (in Chinese)
[37] 谭勇, 王敬锋. 水利设计信息化的现状分析和发展策略[J]. 工程建设与设计, 2021(3): 90-91, 94. TAN Y, WANG J F. Current situation analysis and development strategy of water conservancy design informatization[J]. Construction and Design for Project, 2021(3): 90-91, 94. (in Chinese)
[38] 王爱国, 张鹤鸣. 建设项目业主方设计管理工作的深化探索与创新实践[J]. 项目管理技术, 2009, 7(5): 33-38. WANG A G, ZHANG H M. On the further exploration and innovation practice of owners' design management in construction projects[J]. Project Management Technology, 2009, 7(5): 33-38. (in Chinese)
[39] 王涛. 工程项目中业主方的设计管理研究: 以连云港项目为例[D]. 北京: 北京建筑大学, 2020. WANG T. Research on the design management process of the owner of construction projects: Take a project as an example[D]. Beijing: Beijing University of Civil Engineering and Architecture, 2020. (in Chinese)
[40] 孙亮. 界面管理在大型建设项目业主方设计管理中的应用[D]. 济南: 山东建筑大学, 2010. SUN L. Application of interface management in owners' design management of large-scale construction projects[D]. Ji'nan: Shandong Jianzhu University, 2010. (in Chinese)
[41] Construction Industry Institute. Assessment of owner project management practices and performance[R]. Austin: Construction Industry Institute, 1990.
[42] LIU S, WANG L, HUANG W. Effects of process and outcome controls on business process outsourcing perfor- mance: Moderating roles of vendor and client capability risks[J]. European Journal of Operational Research, 2017, 260(3): 1115-1128.
[43] 张水波, 杨秋波. 国际EPC交钥匙合同业主方的设计管理[J]. 中国港湾建设, 2008(5): 63-66. ZHANG S B, YANG Q B. Design management by owner for international EPC/turnkey project[J]. China Harbour Engineering, 2008(5): 63-66. (in Chinese)
[44] 边芳. 基于界面管理的业主方设计管理[D]. 重庆: 重庆大学, 2012. BIAN F. Application of interface management in owners' design management[D]. Chongqing: Chongqing University, 2012. (in Chinese)
[45] BUBSHAIT A A. Owner involvement in project quality[J]. International Journal of Project Management, 1994, 12(2): 115-117.
[46] KOMETA S T, OLOMOLAIYE P O, HARRIS F C. A review of client-generated risks to project consultants[J]. International Journal of Project Management, 1996, 14(5): 273-279.
[47] 金培培. 房地产开发项目设计管理[J]. 科协论坛(下半月), 2008(9): 2. JIN P P. Design management of real estate development projects[J]. Science and Technology Association Forum (Second Half Month), 2008(9): 2. (in Chinese)
[48] IYER K C, JHA K N. Factors affecting cost performance: Evidence from Indian construction projects[J]. International Journal of Project Management, 2005, 23(4): 283-295.
[49] 顾承东, 彭栋宇, 程欣欣, 等. 建设项目业主方设计管理绩效及其评价[G]//上海空港, 第14辑. 上海: 上海世纪出版股份有限公司科学技术出版社, 2012: 60-64. GU C D, PENG D Y, CHENG X X, et al. Design management performance of construction project owners[G]// Shanghai Airport, Vol. 14. Shanghai: Shanghai Century Publishing Science and Technology Press, 2012: 60-64. (in Chinese)
[50] 孙亮, 李文彬, 安震. 大型建设项目业主方设计管理组织构架研究[J]. 建筑经济, 2009(S2): 66-68. SUN L, LI W B, AN Z. Study on the organization's framework of design management conducted by the large construction clients[J]. Construction Economy, 2009(S2): 66-68. (in Chinese)
[51] STUKHART G. Contractual incentives[J]. Journal of Construction Engineering and Management, 1984, 110(1): 34-42.
[52] HU Y, CHAN A P C, LE Y. Pragmatic framework of programme organizational capability for delivering megaprojects at design and construction phases: A Chinese client perspective[J]. Engineering Project Organization Journal, 2015, 5(2-3): 49-62.
[53] ABU-HIJLEH S F, IBBS C W. Schedule-based construction incentives[J]. Journal of Construction Engineering and Management, 1989, 115(3): 430-443.
[54] LING F Y Y, RAHMAN M M, NG T L. Incorporating contractual incentives to facilitate relational contracting[J]. Journal of Professional Issues in Engineering Education and Practice, 2006, 132(1): 57-66.
[55] ROSE T, MANLEY K. Client recommendations for financial incentives on construction projects[J]. Engineering, Construction and Architectural Management, 2010, 17(3): 252-267.
[56] WANG Y H, SHEN W X, TANG W Z. Effects of contractual incentives in construction projects[C]// International Conference on Construction and Real Estate Management. Reston: American Society of Civil Engineers, 2019: 256-262.
[57] ARDITI D, YASAMIS F. Incentive/disincentive contracts: Perceptions of owners and contractors[J]. Journal of Construction Engineering and Management, 1998, 124(5): 361-373.
[58] European Construction Institute. Long-term partnering: Achieving continuous improvement and value[R]. Watford: European Construction Institute, 2003.
[59] MENG X H, GALLAGHER B. The impact of incentive mechanisms on project performance[J]. International Journal of Project Management, 2012, 30(3): 352-362.
[60] WANG S L, TANG W Z, LI Y X. Relationship between owners' capabilities and project performance on development of hydropower projects in China[J]. Journal of Construction Engineering and Management, 2013, 139(9): 1168-1178.
[61] ADAM A, LINDAHL G. Applying the dynamic capabilities framework in the case of a large public construction client[J]. Construction Management and Economics, 2017, 35(7): 420-431.
[62] ZHONG Y, CHEN Z G, ZHOU Z, et al. Uncertainty analysis and resource allocation in construction project management[J]. Engineering Management Journal, 2018, 30(4): 293-305.
[63] 段斌, 陈刚, 严锦江. 项目业主加强水电工程前期勘测设计管理浅析[J]. 人民长江, 2014, 45(8): 8-12. DUAN B, CHEN G, YAN J J. Analysis of strengthening preparatory investigation and design management of hydropower projects by owner[J]. Yangtze River, 2014, 45(8): 8-12. (in Chinese)
[64] 王小娥. 水电项目业主如何做好设计管理工作的探讨[J]. 人民长江, 2012, 43(15): 95-97, 106. WANG X E. Discussion on how to doing a good job on design management work by owner of hydropower project[J]. Yangtze River, 2012, 43(15): 95-97, 106. (in Chinese)
[65] LAM P T I, WONG F W H, CHAN A P C. Contributions of designers to improving buildability and constructability[J]. Design Studies, 2006, 27(4): 457-479.
[66] ROSE T, MANLEY K. Motivation toward financial incentive goals on construction projects[J]. Journal of Business Research, 2011, 64(7): 765-773.
[67] OGWUELEKA A C, UDOUDOH F P. The impact of risk and reward dynamics in incentive compensation plans in the Nigerian construction industry[J]. International Journal of Construction Management, 2018, 18(3): 247-259.
[68] TANG W Z, DUFFIELD C F, YOUNG D M. Partnering mechanism in construction: An empirical study on the Chinese construction industry[J]. Journal of Construction Engineering and Management, 2006, 132(3): 217-229.