[1] 刘恒, 宋轩, 耿雷华, 等. 南水北调中线交叉建筑物洪水风险估算模型研究[J]. 人民长江, 2010, 41(8):74-77, 99. LIU H, SONG X, GENG L H, et al. Research on flood risk estimation model of cross structures in Middle Route Project of South-North Water Diversion[J]. Yangtze River, 2010, 41(8):74-77, 99. (in Chinese)
[2] 刘涛, 邵东国, 顾文权. 基于层次分析法的供水风险综合评价模型[J]. 武汉大学学报(工学版), 2006, 39(4):25-28. LIU T, SHAO D G, GU W Q. Risk comprehensive evaluation of water supply in middle and lower reaches of Hanjiang River after implementation of Middle Route of South-to-North Water Diversion[J]. Engineering Journal of Wuhan University, 2006, 39(4):25-28. (in Chinese)
[3] 梁忠民. 南水北调中线工程供水量风险分析[J]. 河海大学学报, 2001, 29(5):49-53. LIANG Z M. Risk analysis on water supply quantity for Middle-line of South-North Water Transfer Project[J]. Journal of Hohai University, 2001, 29(5):49-53. (in Chinese)
[4] 李芬. 南水北调中线冰情综合分析平台研究[D]. 大连:大连理工大学, 2016. LI F. Research of comprehensive analysis platform for the Middle Route of Southe-to-North Water Transfer Project during freezing period[D]. Dalian:Dalian University of Technology, 2016. (in Chinese)
[5] 许新宜, 尹宏伟, 姚建文. 南水北调东线治污及其输水水质风险分析[J]. 水资源保护, 2004(2):1-2, 8. XU X Y, YIN H W, YAO J W. Pollution remediation along east route of South-to-North Water Transfer Project and risk analysis of quality of water conveyance[J]. Water Resources Protection, 2004(2):1-2, 8. (in Chinese)
[6] 肖伟华, 庞莹莹, 张连会, 等. 南水北调东线工程突发性水环境风险管理研究[J]. 南水北调与水利科技, 2010, 8(5):17-21. XIAO W H, PANG Y Y, ZHANG L H, et al. Study on the emergency water environmental risk management during operating period in the Eastern Route of South-to-North Water Diversion[J]. South-to-North Water Transfers and Water Science & Technology, 2010, 8(5):17-21. (in Chinese)
[7] 贾超, 刘宁, 陈进, 等. 南水北调中线工程渡槽结构风险分析[J]. 水力发电, 2003, 29(7):23-27. JIA C, LIU N, CHEN J, et al. Risk analysis for aqueduct structure of the South-North Water Transfer Project (Central Route)[J]. Water Power, 2003, 29(7):23-27. (in Chinese)
[8] 朱元甡, 韩国宏, 王汝慈, 等. 南水北调中线工程交叉建筑物水毁风险分析[J]. 水文, 1995, 15(3):1-7, 65. ZHU Y S, HAN G H, WANG R C, et al. The risk analysis of flood damaging to the cross-structures on the main canal of the South-to-North Water Transfer Project[J]. Journal of China Hydrology, 1995, 15(3):1-7, 65. (in Chinese)
[9] SAATY T L. Analytic hierarchy process[M]. New York:McGraw-Hill, 1980:19-28.
[10] 耿雷华, 姜蓓蕾, 刘恒, 等. 南水北调东中线运行工程风险管理研究[M]. 北京:中国环境科学出版社, 2010. GENG L H, JIANG B L, LIU H, et al. Study on the operation risk management of East and Middle Line of the South-to-North Water Diversion Project[M]. Beijing:China Environmental Science Press, 2010. (in Chinese)
[11] 郭鹏, 施品贵. 项目风险模糊灰色综合评价方法研究[J]. 西安理工大学学报, 2005, 21(1):106-109. GUO P, SHI P G. Research on fuzzy-grey comprehensive evaluation method of project risk[J]. Journal of Xi'an University of Technology, 2005, 21(1):106-109. (in Chinese)
[12] 赖成光, 王兆礼, 宋海娟. 基于BP神经网络的北江流域洪灾风险评价[J]. 水电能源科学, 2011, 29(3):57-59, 161. LAI C G, WANG Z L, SONG H J. Risk assessment of flood hazard in Beijiang river basin based on BP neural network[J]. Water Resources and Power, 2011, 29(3):57-59, 161. (in Chinese)
[13] 李绍飞, 余萍, 孙书洪. 基于神经网络的蓄滞洪区洪灾风险模糊综合评价[J]. 中国农村水利水电, 2008(6):60-64. LI S F, YU P, SUN S H. Fuzzy risk assessment of flood hazard based on artificial neural network for detention basin[J]. China Rural Water and Hydropower, 2008(6):60-64. (in Chinese)
[14] 宋轩, 刘恒, 耿雷华, 等. 南水北调中线工程交叉建筑物风险识别[J]. 南水北调与水利科技, 2009, 7(4):13-15. SONG X, LIU H, GENG L H, et al. Risk identification for crossing structures in the Middle Route of the South-to-North Water Transfer Project[J]. South-to-North Water Transfers and Water Science & Technology, 2009, 7(4):13-15. (in Chinese)
[15] 夏富洲. 渡槽水毁及其它破坏的修复[J]. 人民长江, 2000, 31(3):17-19, 50. XIA F Z. Repairing of aqueduct damage by water and other failures[J]. Yangtze River, 2000, 31(3):17-19, 50. (in Chinese)
[16] 张劲松, 徐云修. 倒虹吸管的破坏分析及修补措施[J]. 中国农村水利水电, 2000(3):6-8. ZHANG J S, XU Y X. Damage analysis and repair of inverted siphon[J]. China Rural Water and Hydropower, 2000(3):6-8. (in Chinese)
[17] 中华人民共和国国家发展和改革委员会. 水工建筑物止水带技术规范:DL/T 5215-2005[S]. 北京:中国电力出版社, 2005. National Development and Reform Commission. Specification for waterstop of hydraulic structure:DL/T 5215-2005[S]. Beijing:Electric Power Press of China, 2005. (in Chinese)
[18] 国家能源局. 水工混凝土钢筋施工规范:DL/T 5169-2013[S]. 北京:中国电力出版社, 2013. National Energy Administration. Specification for construction of hydraulic concrete reinforcement:DL/T 5169-2013[S]. Beijing:China Electric Power Press, 2013. (in Chinese)
[19] 中华人民共和国住房和城乡建设部, 中华人民共和国国家质量监督检验检疫总局. 防洪标准:GB 50201-2014[S]. 北京:中国标准出版社, 2015. Ministry of Housing and Urban-Rural Development of the People's Republic of China, General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China. Standard for flood control:GB 50201-2014[S]. Beijing:Standards Press of China, 2015. (in Chinese)
[20] 中华人民共和国住房和城乡建设部. 混凝土质量控制标准:GB 50164-2011[S]. 北京:中国建筑工业出版社, 2012. Ministry of Housing and Urban-Rural Development of the People's Republic of China. Standard foe quality control of concrete:GB 50164-2011[S]. Beijing:China Architecture & Building Press, 2012. (in Chinese)
[21] 中华人民共和国住房和城乡建设部. 建筑地基处理技术规范:JGJ 79-2012[S]. 北京:中国建筑工业出版社, 2013. Ministry of Housing and Urban-Rural Development of the People's Republic of China. Technical code for ground treatment of buildings:JGJ 79-2012[S]. Beijing:China Architecture & Building Press, 2013. (in Chinese)
[22] 中华人民共和国水利部. 水利水电工程施工质量检验与评定规程:SL 176-2007[S]. 北京:中国水利水电出版社, 2007. The Ministry of Water Resources of the People's Republic of China. Inspection and assessment specification for construction quality of hydraulic and hydroelectric engineering:SL 176-2007[S]. Beijing:China Water & Power Press, 2007. (in Chinese)
[23] 中华人民共和国水利部. 水利水电工程等级划分及洪水标准:SL 252-2017[S]. 北京:中国水利水电出版社, 2017. The Ministry of Water Resources of the People's Republic of China. Standard for rank classification and flood protection criteria of water and hydropower projects:SL 252-2017[S]. Beijing:China Water & Power Press, 2017. (in Chinese)
[24] 中华人民共和国水利部. 灌溉与排水渠系建筑物设计规范:SL 482-2011[S]. 北京:中国水利水电出版社, 2011. The Ministry of Water Resources of the People's Republic of China. Code for design of irrigation and drainage canal system structures:SL 482-2011[S]. Beijing:China Water & Power Press, 2011. (in Chinese)
[25] 中华人民共和国交通部. 公路工程水文勘测设计规范:JTG C30-2002[S]. 北京:人民交通出版社, 2004. Ministry of Transport of the People's Republic of China. Hydrological specifications for survey and design of highway engineering:JTG C30-2002[S]. Beijing:China Communications Press, 2004. (in Chinese)
[26] 中华人民共和国水利部. 水工混凝土结构设计规范:SL 191-2008[S]. 北京:中国水利水电出版社, 2009. The Ministry of Water Resources of the People's Republic of China. Design code for hydraulic concrete structures:SL 191-2008[S]. Beijing:China Water & Power Press, 2009. (in Chinese)
[27] OLSEN J R, STEDINGER J R, MATALAS N C, et al. Climate variability and flood frequency estimation for the upper mississippi and lower missouri rivers[J]. Journal of the American Water Resources Association, 1999, 35(6):1509-1523.
[28] TUNG Y K. Models for evaluating flow conveyance reliability of hydraulic structures[J]. Water Resources Research, 1985, 21(10):1463-1468.
[29] TUNG Y K. Risk-based design of flood defense systems[C]//Proceedings of the 2nd International Symposium on Flood Defense. Beijing, China:Tsinghua University, 2002.